Laserfiche WebLink
Page Of <br />SWRCB, January 2002 <br />Test Method Developed BY: <br />0 Tank Manufacturer <br />0 Other (Specify) <br />o industry standard [I Professional Engineer <br />Test Method Used: <br />0 Pressure <br />0 Mer (Specify) <br />11 Vacuum <br />0 Hydrostatic <br />Test Equipment Used: <br />Is Tank Exempt From Testing?' <br />Tank# <br />0 Yes 0 No <br />Tank# <br />0 Yes ONO <br />Equipment Resolution: <br />k"M I IIIIIIIINEEM <br />Tank # Tank # <br />0 Yes ONO 0 Yes ONO <br />Tank Capacity. <br />Tank Material: <br />Tank Manufacturer: <br />Product Stored: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time. <br />-initial Reading (R,): <br />Test End Tune: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RD: <br />passfflail Threshold or Criteria: <br />Was sensor remov I for testin9l <br />0 Yes U NO <br />Was sensor properly replaced and <br />Oyes ONO 0 N <br />Oyes ONO 0 N <br />0yes ONO 0 N DYcs ONO 0 N <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. (California Code of Regulations, Title 23, Section 2637(a)(6)) <br />