Laserfiche WebLink
SWp,CB, January 2002 <br />Test Method Developed By: <br />Test Method Used: <br />I <br />rTest iouiument Used: <br />5. SECONDA] <br />0 Piping Manufacturer <br />0 Other (Specify) <br />,'Pressure <br />0 Other (Specify) <br />Piping Run N :?7 PIP <br />L -j <br />Page -jL Of <br />PIPE, TESTING <br />Industry Standard 0 Professional Engineer <br />0 Vacuum 0 Hydrostatic <br />1EIquipment Resolution: <br />Run# Piping n # Piping R%m# <br />Comments — (include ation on repairs m recommended for failed tests) <br />Length of Piping Run: <br />We7 &—dand location of <br />Wait time betweenapplying <br />pressurelvacuum/water and <br />-startmg test <br />Comments — (include ation on repairs m recommended for failed tests) <br />