Laserfiche WebLink
JUN -04-2008 14:45 Service Station Systems 408 938 8888 P.12 <br />12, FILL RISER CONTAINMENT SUW TESTING <br />Facility is Not Equipped With Fill Riser Containment Sumps <br />❑ <br />Fill Riser Containment Sumps are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />E) Other (Specify) <br />IS Indwitry Standard p Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />® Other (Specify) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used: Incon Sump Tester <br />Fill ;UME # S7 <br />Fill Sump # 89 <br />Equipment Resolution: +/- 0.002" <br />Fill Sump # 91 Fill Sump # DSL <br />S!!Lmp Diameter: <br />42" <br />42" <br />42" <br />42" <br />Sump De eh: <br />82" <br />82" <br />82" <br />82" <br />Height from Tank Top to Top of <br />Highest Pipj!jS Penetration: <br />N/A <br />N/A <br />N/A <br />N/A <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />20" <br />20" <br />20" <br />20" <br />Condition of sump prior to <br />testin <br />Good <br />Good <br />Good <br />(:rood <br />Portion of Sump Tested <br />2" above giping <br />2" above pipinz <br />2" above piping <br />2" above piping <br />Sump Material: <br />Fiberglass <br />Fiberglms <br />fiberglass <br />fiberglass <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />9:57 am <br />11.06 am <br />9:13 am <br />9:13 am <br />Initial Reading (RT): <br />3.0520 <br />4.3976 <br />4.4846 <br />4.5565 <br />Test End Time: <br />10:12 am <br />11:21 am <br />9:28 am <br />9:28 am <br />Final Reading (RF): <br />3.0503 <br />4.3987 <br />4.4855 <br />4.5586 <br />Test Duration: <br />is min. <br />15 min <br />15 min <br />15 min <br />Chane in Read' (RF -R): <br />-0.0017 <br />+0.0011 <br />+0.0009 <br />+0.0021 <br />Pass/Fail Threshold or Criteria.: <br />+/- 0.0(12" <br />+/- 0.002" <br />+/-0.0071 <br />+/- 0.002" <br />Test Result: <br />® Pass Fail <br />CM Pass Fail <br />0 Pass Fail <br />Pass 0 Fail <br />Is there a sensor in the sum ? <br />® Yes ❑ No <br />® Yes 0 No <br />® Yes ❑ No <br />® Yes ❑ No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />❑ Yes ❑ No ®NA <br />❑ Yes p No ®NA <br />a Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />Was sensor removed for testing? <br />O Yes ❑ No ❑ NA <br />® Ycs ❑ No ❑ NA <br />O Yes ❑ No ❑ NA <br />O Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />M yes ❑ No ❑ NA <br />® Yes ❑ No CI NA <br />® Yes ❑ No ❑ NA <br />0 Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to teuting, and recommended follow-up for failed tests) <br />calor, functionality was not confirmed. This procedure is <br />not part of the Secondary Containment testing scope of work". <br />DSL fill sump failed. Increased, vibration due to heavy wind <br />