Laserfiche WebLink
JUN -04-2008 14:45 Service Station Systems 408 938 8888 <br />Test Method Developed By: <br />❑ UDC Manufacturer R Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />Q Pressure <br />❑ Othel (Specify) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used: Incon Sump Tester <br />UDC # 17/18 <br />UDC # 19120 <br />Equipment Resolution: +/- 0.002" <br />UDC # 21/22 <br />UDC Manufacturer: <br />OPW <br />OPW <br />OPW <br />UDC Material: <br />Plastic <br />Plastic <br />Plastic <br />UDC Depth: <br />31" <br />31" <br />31" <br />Height from UDC Bottom to Top <br />of Highest Pip!R& Penetration: <br />19" <br />19" <br />19" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />11" <br />11" <br />11" <br />Condition of UDC prior to <br />testin : <br />(;rood <br />Good <br />Good <br />Portion of UDC Tested <br />2" above piping <br />2" above piping <br />2" above 2j2inS <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?' <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ONA <br />Turbine shutdown resE2nse time <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?" <br />❑ Yes ❑ No R NA <br />L3 Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />Was fail-safe verified to be <br />o ational?* <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No RNA <br />❑ Yes ❑ No ®NA <br />Wait time between applying <br />pressurelvacuum/water and <br />starting test <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />7:24 am <br />6:51 am <br />4:51 pm <br />Initial Reading W: <br />3.1487 <br />2.9187 <br />4.0797 <br />Test End Time: <br />7:40 ani <br />7:07 am <br />5:07 pm <br />Final Reading (RF): <br />3.1486 <br />2.9190 <br />4.0790 <br />Test.Duration: <br />16 min. <br />16 min. <br />16 min. <br />ChM.in in Reading (RpRt): <br />-0,0001 <br />+0.0003 <br />-O.O(X07 <br />Pass/Fail Threshold or Criteria: <br />+/-0.00211 <br />+/-0.002" <br />+/-0.002" <br />Test Result: <br />0 Pass Fail <br />0 Pass Fail <br />® Pass Faff <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />N Yes Q No ❑ NA <br />® Yes ❑ No ❑NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />® Yes Cl No ❑ NA <br />0 Yes ❑ No ❑ NA <br />I <br />® Yes ❑ No [:]NA <br />I E <br />Comments — (include information on repairs made prior to testing, and recommended follow -ftp for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to Lny of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC mast be tested. (See SWRCB LG -160) <br />