Laserfiche WebLink
JUN -04-2008 14:50 Service Station Systems 408 938 8888 P.17/19 <br />0 0 <br />Test Method Developed By: <br />❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />J@ hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Ineon Sump Tester <br />Equipment Resolution: +/- 0.002" <br />STP Sump # 87 A <br />STP Sump # 91 A <br />STP Sump # 89 B <br />STP Sump # DSI. <br />Sump Diameter: <br />42" <br />42" <br />42" <br />42" <br />Sump Depth: <br />8019 <br />80ax <br />8099 <br />80" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />14" <br />l4" <br />14" <br />14" <br />Highest PipiRg Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />22" <br />22" <br />2217 <br />22" <br />Condition of sump prior to testing: <br />Good <br />Good <br />Good <br />Good <br />Portion of Stunp Tested' <br />2" above piping <br />2b9 above piping <br />2" above piping <br />2" above piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No RNA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />roduct and water)?* <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?' <br />❑ yes ❑ No ® NA <br />❑ Yes ❑ No RNA <br />❑ Yes ❑ No ®NA <br />0 Yes ❑ No RNA <br />Was fail-safe verified to be <br />o erationalf <br />❑ Yu -4 ❑ No ® NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ® No ®NA <br />❑ Yes ❑ No ®NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />test: <br />Test Start Time: <br />2:09 pm <br />3:09 pm <br />1:46 pm <br />3:09 pm <br />Initial Reading (RO: <br />35638 <br />5.1625 <br />2.3703 <br />5.0619 <br />Test End Time: <br />2:24 pm <br />3:25 pm <br />2:01 pm <br />3:25 pm <br />Final Reading (RF): <br />3.5641 <br />5.1637 <br />2.3700 <br />5.0620 <br />Test Duration. <br />15 min. <br />16 min <br />15 min. <br />16 min. <br />Change in Reading (RF -R): <br />+0.0003 <br />+0.0012 <br />-0.0003 <br />+0.0001 <br />Pass/Fall Threshold or Criteria: <br />+/-0.002" <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002„ <br />Test Result: <br />® Pass Fail <br />® Pass Fail <br />® pass bail <br />® Pass Fail <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑NA <br />0 Yes ❑ No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />yes L No ❑ NA <br />® Yes ❑ No ❑ NA <br />®Yes ❑ No ❑NA <br />®Yes p No ❑NA <br />Comments — (include information on repairs made prior to testing, and recommendedLollyw-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />Resealed around product/vent piping penetration <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to aU of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be te.5ted_ (See SWRCB LG -160) <br />