Laserfiche WebLink
i <br /> JFNHIED PROGRAM CONSOLIDATED FOAM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2 CHANGE OF INFORMATION 4941. <br /> . PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2 THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Spkrj JdA4?�Aop <br /> Go►twrry aoww�sau» PAaresx�4 GAI�A�E <br /> BUSINESS SITE ADDRESS 103. Cjly 104. <br /> 121 5. SR nl --VDA Q uWJ ST'R£feT S(-OGK-rO1J CA q S 2 0 Z <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> b_y f equipment manufacturers'-instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.[7.3 ccR§2632,2630-,2638 2641490-3.] <br /> MONITORING EQUIPMENT IS SERVICED ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> III. MONITORM LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 4944. <br /> ❑ [23 CCR§2632,2634] <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) thateap 111 <br /> Nr 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 4945. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 632,2634] <br /> SECONDARY CONTAINMENT IS: R&DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: V F-tEO£R -12.007 4947. MODEL#: TLS -S 490-8. <br /> LEAK SENSOR MANUFACTURER: V£*b6Z- f-LO T1' 490-9. MODEL#(S): 4 0 9 490-10. <br /> ❑ 2 AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 49412. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 49414. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ &CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: Ela.0.1 g.p.h. El b.0.2 g.p.h. El c.OTHER(Specify): 4901918. <br /> ❑ 3 MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20. <br /> ❑ 4 WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS E] 0 <br /> b.60 HOURS 4921' <br /> _.. ... ..... <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§264311 0-90-23. <br /> TEST FREQUENCY: ❑ ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(S 0-90-20- <br /> a. <br /> _ ....... P �) ago 2s.._. . <br /> E] 0 <br /> 99.OTHER(Specify): 4926. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that a k all <br /> 1.CONTINUOUS MONITORING OF PIPEiPIPING S S)AND OTHER SECONDARY CONTARjMENT WITH AUDIBLE&,VISUAL ALARMS. 49x28. <br /> [§2636] SECONDARY CONTAINMENT IS: a-DRY ❑ b.LIQUID FILLED ❑ a.PRESSURIZED ❑ d.UNDER VACUUM 49429. <br /> PANEL MANUFACTURER: V££DSR-Rots7' 49430. MODEL#: 11-S-3 570 49431. <br /> LEAK SENSOR MANUFACTURER: V V fi0Fjq -a 0Cr-& 490-32. MODEL#(S): 205 49433. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑ b.NO 490-34. <br /> FAMURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Da a.YES ❑ b.NO 49435. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MC.LD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 49436. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S): V APPAL�9.SS 49437. MODEL#(S): q q LO 12000 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490-00. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ &YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49444. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> a.ANNUALLY b.EVERY 3 YEARS c.OTHER0- <br /> 90-46. <br /> TEST FREQUENCY: ❑ <br /> Q ❑ ❑ (Specify) 0-90-0-47.7. <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49449. <br /> *Allowed for momtonng of rmbmed emergency generator fuel Aping only per HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(8x3)] 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ..._... .._.. ................ . <br /> ❑ <br /> 99.OTHER(Specify) 'SYSTEMNAS AF-n%CT£ F=-LL --._.__.._._._.. 49453. <br /> 49452. <br /> UPCF UST-D(12!2007)-I/4 www.unido4s.org <br />