Laserfiche WebLink
-UMWIE <br /> D PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Checks!) <br /> that 1) <br /> ;; �QONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> 6{J/1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54& <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-546. <br /> _ <br /> ..--..._..........._._..._.....-_._...._-..-__._........_._._...................................._.._._.._..__.-......_....._- -- - --- <br /> LEAK MONITOR MANUFACTURER: V F_SD£R- Pt&O-r 490-55. MODEL#: TLS-3.517 490-56 <br /> LEAK SENSOR MANUFACTURER: J Ft=1ER .- A"" 490-57. MODEL#(S): Zeoq490-51. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. a.YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ,�.,�YES [Ib.NO 49060. <br /> FAILURE/DISCONNECPION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. W a-YES ❑ b.NO 490-61- <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. YES ❑ b.NO 490-62. <br /> UDC CONSTRUCTION IS: SINGLE WALL ___ - . <br /> ❑ 2.DOUBLE WALL 490.63. <br /> IF DOUBLE WALL: 490-64& <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490646. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 CCR§2644.1] <br /> 2 SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67E <br /> VIII. RECORD KEEPING <br /> The lowing monitoring/mace records are kept for this facility: 49068. <br /> a.ALARM LOGS b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> [ ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69& <br /> REFWENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> • VS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> RATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-690- <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49"9f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490.69g. <br /> ❑ <br /> 9XIER(Specify): 490-691L <br /> 49"91. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's beat management practices. <br /> ➢ The facility employee's rote with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's rote with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. a 71. <br /> C VVA FyLL. PACTC-0TWON s3 ARov OPLL(c 150 V'ALvE E-rdo-gS%c9F-»aK CAP;; LARM <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate apossible release are investigated and 3.)all monitoring records are maintained properly. <br /> ......... <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: :YO$£PM 136O.-Fu 490-72. TITLE: COrvfi'RAcre(Z Fb2 CCUKJIyfIISTaD 490-73. <br /> NAME: -55F 't3ERum EN 490-74. TITLE: CGarr2Ac r02 t:R CaLn rY l�T.DO ago 7s. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490.77. <br /> REPRESENTING:❑1.Tank OwndOparhrU 2.F - OwnQ/ �)d Reprennubw ofOwoer 490.76. <br /> APPLICANT NAME(print): 490-78. APPLICANT TITLE: 490-79, <br /> JbS 4 BA�-£y GaAirraAr_Tc)R FM COtLrt�*Y`L(STaO <br /> UPCF UST-D(12/2007)-3/4 www.unidoes.org <br />