Laserfiche WebLink
Tp 91 40139 P.16 <br />The propane dispensing equipment is not directly <br />interfaced with the ♦ #system, <br />= ii therefore, <br />• <br />must hand -key the gallons • « from the propane <br />by <br />labeled pump <br />Because we do not - <br />gallonsve this interface, it is possible that <br />different entered <br />actually dispensed. in order to monitor and control this <br />ar . <br />situation, it 'is <br />necessary meterreadings» the♦ O <br />key the mechanical <br />S system. <br />The accounting manager should look at an edit of <br />:;.ly SalxReport (DSR) and review the fuel <br />reconciliation section. This _ • . <br />difference between <br />meter readings f or pump :r This difference in <br />the <br />amount gallons that <br />Theaccounting <br />discrepancyentered incorrectlY into the FOS system. <br />manager should also notify the General Manager of any <br />significant amounts - <br />For <br />spillsmall fuel defined <br />than 25 ♦ # <br />Plaza employee <br />should clean-up the spill i=ondiately. <br />2. Do not use concrete cleaner or other chemicals to <br />treat oil spills if the area involved directly drains <br />into a stream, wet storm drain, ditch, holding pond <br />or oil/water separator. Dust the spill with absorbent <br />(which is located in the storage «s directlybehind <br />the building) and sweep up as required. <br />3. Concrete cleaner or other chemicals may • `. e <br />accordance with manufacturerl s instructions, if there <br />are no direct drains i.wateror - <br />