Laserfiche WebLink
SWRC%January 2002 Page 2 <br /> 9. S L/OVERFILL CONTAINMENT AES <br /> Facility is Not Equipped With Spilb'Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: F] Spill Bucket Manufacturer a Industry Standard F-1 Professional Engineer <br /> 11 Other(Specify) <br /> Test Method Used: F] Pressure F-1VacuumX Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> M - <br /> Spill Box# REG Spill Box# PLUS Spill Box# PREMIUM Spill Box# DIESEL <br /> Bucket Diameter: 12 12 12 12 <br /> Bucket Depth: 14 14 14 14 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 5 <br /> starting test: <br /> Test Start Time: 1230 1230 1230 1230 <br /> Initial Reading(RI ): 8 8 8 6 <br /> Test End Time: 1330 1330 1330 1330 <br /> Final Reading(RF ): $ 8 $ 6 <br /> Test Duration: 60 mins 60 mins 60 mins 60 mins <br /> Change in Reading(R F-Rt ) 0 0 0 0 <br /> Pass/Fail Threshold or 1/8-60 1/8-60 1/8-60 1/8-60 <br /> Criteria: <br /> EM SEEM <br /> Comments - (include information on repairs made prior to testing, and recommended follow-zip for,fezile(I tests) <br /> manufacturer OPW AND PHIL TITE <br />