Laserfiche WebLink
•SWRCB,January 2002 Page 3. <br /> 9. S L/OVERFILL CONTAINMENT AES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: 11 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer I " t Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ Pressure 1] Vacuum 1 x 1 Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# DIESEL Spill Box# DIESEL Spill Box#OIL/WATR Spill Box# <br /> Bucket Diameter: 12 12 12 <br /> Bucket Depth: 14 14 14 <br /> Wait time between applying <br /> pressure/vacutun/water and 5 5 5 <br /> starting test: <br /> Test Start Time: 1230 1230 1230 <br /> Initial Reading(R t ): 6 6 6.5 <br /> Test End Time: 1330 1330 1330 <br /> Final Reading(RF 1 6 6 6.5 <br /> Test Duration: 60 mins 60 mins 60 mins <br /> Change in Reading(R F-Rt ) 0 0 0 <br /> Pass/Fail Threshold or 1/8-60 1/8-60 1/8-60 <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommencled follow-zip for,fcziled tests) <br /> manufacturer OPW AND PHIL TITS <br />