Laserfiche WebLink
'toring System Certification <br /> Site Address: 1501 N.JACK TONE RD Date of Testing/Service: 04/17/2006 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 317.02 <br /> Complete the following checklist: <br /> X Yes 11 No` Is the audible alarm operational? <br /> O Yes Ej No° Is the visual alarm operational? <br /> ❑x Yes No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> Yes ❑No• interfere with their proper operation? <br /> Yes No" x N/A if alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑x Yes ❑No' ❑N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑ Sump/Trench Sensors; ❑x Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ® Yes No <br /> ® Yes ❑No` ❑X N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? 0/6 <br /> ® <br /> Yes* ®No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑X Yes" ❑No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> El Water. If yes,describe causes in Section E,below. <br /> ❑x Yes ❑No• Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> nx Yes ❑No° FS <br /> all monitoring equipment operational per manufacturers'specifications? <br /> In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 Based on CA form dated 03/01 <br />