Laserfiche WebLink
oring System Certification <br /> Site Address: 1501 N. JACK TONE RD Date of Testing/Service: 04/17/2006 <br /> F. In-Tank Gauging/SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ®Yes ❑No° Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes Fi No- Was accuracy of system product level readings tested? <br /> ®Yes ❑No. Was accuracy of system water level readings tested? <br /> Yes ❑No' Were all probes reinstalled properly? <br /> ❑Yes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> F-1 Yes E]No• ❑N/A <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> (Check all that apply)Simulated leak rate: ❑ 3 g.p.h❑0.1 g.p.h E]0.2 g.p.h <br /> Yes ❑No# Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑No• Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No� ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No" ❑NIA For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes [:]No° ❑NIA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No. ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> E]Yes I❑No• ❑N!A I For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes ❑No°I I Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />