Laserfiche WebLink
SWRCB,January 2002 Page <br /> of <br /> 12. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specijy) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Vacuum Gage W/Nitrogen Equipment Resolution: .2 PSI <br /> Im � 11111 1 1 1 IMMMM31AIREIIESEEM <br /> Piping Run#8-91 Piping Run#7-89 Piping Run#6-87 Piping Ran#5-DsI <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Smith <br /> Piping Manufactur' F77 Smith Smith Smith <br /> Piping Diameter: 3" 3" 3-) 3" <br /> Length of Piping Run: 285 Feet 280 Feet 275 Feet 290 Feet <br /> Product Stored: 91 89 87 Diesel <br /> Method and location of Piping Sump Piping Sump Piping Sump Piping Sump <br /> p!ping:run isolation: Test Boot Test Boot Test Boot Test Boot <br /> Wait time between applying <br /> pressure/vacuum/water and 15 in 15 Min 15 Min 15 in <br /> starting test: <br /> Test Start Time: 10:30 14:15 16:00 11:00 <br /> Initial Reading(Rj): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 11-30 15:15 17:00 12:00 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test Duration: I Hour I Hour I Hour I Hour <br /> Change in Reading(RF-R : 0 PSI 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or 0 PSI 0 PSI 0 PSI 0 PSI <br /> Criteria: <br /> Tot Pinuft: x Powf1 OFall 13it x Pass 0 ail <br /> Comments—(include iq�rmation on repairs made ELior to testing, and recommendedfolio w-upforfailed tests) <br /> Piping run#8—91 Piping sump#I to all 91 Dispensers. <br /> Piping run#7—89 Piping sump#2 to all 89 Dispensers, <br /> Piping run#6—87 Piping sump#3 to all 87 Dispensers. <br /> Piping run#5—Diesel Piping sump#4 to Dispensers#26-30&Dispensers#26-30 Satellites. <br />