My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:40:04 PM
Creation date
6/23/2020 6:56:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2007
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 0 Page -1 of--,\' <br /> 3. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufactwer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Vacuum Gage W/Nitrogen Equipment Resolution: .2 PSI <br /> Piping n#4 'pin un ping un#2 in un 1 <br /> Piping Material, Fiberglass Fiberglass Fiberglass Fi r s <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 315 3" 3" <br /> Length of Piping Run: 20 Feet 1851, 20 Feet 220 Feet <br /> Product Stored: Diesel Siphon Diesel Diesel Siphon Diesel <br /> Method and location of Piping Sump Piping Sump Piping Sump Piping Sump <br /> piping-run isolation: Test Boot Test Boot Test Boot Test Boot <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Min 15 Min 15 Min 15 Min <br /> starting test: <br /> Test Start Time: 11:00 12: 12: 14:00 <br /> Initial Reading(RO: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 12:00 13:00 13:00 15:00 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test Duration: I Hour I Hour I Hour I Hour <br /> Change in Reading(RF-Ri): 0 PSI 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or +/-0 PSI +/-0 PSI +/-0 PSI +/-0 PSI <br /> Criteria: <br /> Test t. X Pass 0 Fall pass 11 D Fall x Pass Oran <br /> Comments—(include information on repairs madeprior to testin , and recommended og wf- or ailed tests) <br /> Piping run#4—Diesel Piping sump#4 to Diesel Piping sump#5.(Siphon) <br /> Piping run#3—Diesel Piping sump#5 to Dispensers#21-25&Dispensers#21-25 Satellites. <br /> Piping run#2—Diesel Piping sump#5 to Diesel Piping sump#6.(Siphon) <br /> Piping run# I —Diesel Piping sump#6 to all Auto Diesel Dispensers,Dispensers# 19-20&Dispensers# 19-20 Satellites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.