Laserfiche WebLink
SWRCB,January 2002 0 Page a A of 3 <br /> 7. SPILIJOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes El <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested 0 <br /> Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> I Test Equipment Used: NITS Mag Probe W/TDU Meter Equipment Resolution: .001" <br /> Spill Box#9-91 Spill Box#8-91 VR Spill Box#7-89 Spill Box#6-89 VR <br /> Bucket Diam <br /> eters <br /> 177 <br /> Bucket Depth <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min 10 Min 10 Min 10 Min <br /> start!!! test: . <br /> Test Start Time: 10:50 10:50 12:30 12:30 <br /> Initial Reading(Ro- 0.0001, 0.0001, 0.000II 0.0001, <br /> Test End Time: 11:02 11:02 12:42 12:42 <br /> Final Reading(RF): 0.0001, 0.0001, 0.0001, 0.0001, <br /> Test Duration: 12 Min 12 Min 12 in 12 in <br /> Change in Reading(RF-Rj): 0.0001, 0.0001, 0,0001, 0,00011 <br /> Pass/Fail Threshold or - <br /> Criteria: +/-.002" +/-,002" +/-.002" +/-.002" <br /> Test Result X iasis C1 Fait IPss C3 ljail X Pass 0 Fail X Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recomm follow-up forfailed tests) <br />