Laserfiche WebLink
SWRCB,January 2002 0 Page of-sla <br /> 28. SPILLJOVERFILL CONTAUqMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested o <br /> Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: MTS Mag Probe W/TDU Meter Equipment Resolution: .001" <br /> Spill Box#5-87 Spill Box#4-87 VR Spill Box#3-Dsl Spill Box#2- sl <br /> Bucket Diameter: 167' 16" <br /> Bucket Depth: F77 I 111 16" 16" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min 10 Min 10 Min 10 in <br /> starting test: <br /> Test Start Time: 12:50 12:50 9:22 10:00 <br /> Initial Reading(Rj): 0.0001, 0.0001, 0.00019 0.000" <br /> Test End Time: 13:02 13:02 9-34 10:12 <br /> Final Reading(RF): 0.000019 0.00001, 0.00119 0,00019 <br /> Test Duration: 12 Min 12 Min 12 Min 12 Min <br /> Change in Reading(RF-RI): 0.0001, 0.00019 0.0011, 0.00019 <br /> Pass/Fail Threshold or +/- 002" +/-.002" +/- .002" .002" <br /> Criteria: <br /> Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 it X Pass 0 Fail <br /> COMMentS— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />