My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:40:04 PM
Creation date
6/23/2020 6:56:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2007
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 0 Page of-sla <br /> 28. SPILLJOVERFILL CONTAUqMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested o <br /> Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: MTS Mag Probe W/TDU Meter Equipment Resolution: .001" <br /> Spill Box#5-87 Spill Box#4-87 VR Spill Box#3-Dsl Spill Box#2- sl <br /> Bucket Diameter: 167' 16" <br /> Bucket Depth: F77 I 111 16" 16" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min 10 Min 10 Min 10 in <br /> starting test: <br /> Test Start Time: 12:50 12:50 9:22 10:00 <br /> Initial Reading(Rj): 0.0001, 0.0001, 0.00019 0.000" <br /> Test End Time: 13:02 13:02 9-34 10:12 <br /> Final Reading(RF): 0.000019 0.00001, 0.00119 0,00019 <br /> Test Duration: 12 Min 12 Min 12 Min 12 Min <br /> Change in Reading(RF-RI): 0.0001, 0.00019 0.0011, 0.00019 <br /> Pass/Fail Threshold or +/- 002" +/-.002" +/- .002" .002" <br /> Criteria: <br /> Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 it X Pass 0 Fail <br /> COMMentS— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.