Laserfiche WebLink
SWRCB,January 2002 0 Page-,a of-A <br /> 29. SPILLI OVEIRFILL CONTAINMENT BOXES <br /> Facility is Not EquiMd With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested 0 <br /> Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: NITS Mag Probe W/TDU Meter Equipment Resolution: .001" <br /> NONE= <br /> Spill Box# I-Diesel Spill Box#2 Spill Box#3 Spill Box#4 <br /> Bucket Diameter: 16" <br /> Bucket Depth: t6" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Min <br /> startigg test: <br /> Test Start Time: 11:00 <br /> Initial Reading(Rj): 0. 0" <br /> Test End Time: 11:12 <br /> Final Reading(RF): 0.0001, <br /> Test Duration: 12 in 12 in 12 in 12 Min <br /> Change in Reading(RF-R,): 0.0001, <br /> Pass/Fail Threshold or .002" +/- .00211 +/-.002" +/-.002'— <br /> Criteria: <br /> Test Result: X Pass 0 Fall 0 Pass OFail ,_ Cl Pass 0 Fail Cl Pass I1 Fail <br /> Comments—(include information on repairs made prior to testing, and rucommendedfollow-upforfailed tests) <br />