Laserfiche WebLink
Subject- March-RIPOn <br /> category: Tank Monitoring <br /> EPA Forms <br /> Chad Ahimer <br /> Stop#). �\t\jV.4 Y.,-,,USE N CLEAN MFASVRIN!1 SAILOR.I-OWER THE BAI�SR SLOWLY INTO THE INTERSTITIAL BRINE <br /> OFSERVOIR LIN I'll- ()UCHES THE BOTT)M OF THE BRINE RESERVOIR.REMOVE BAILOR AND RECORD THE <br /> ,�ACTUAL BRINE IN HES ON THE FORM,Al NAYS RETURN BRINE SOLUTION BACK INTO THE BRINE RESERVOIR AND <br /> IRETUPN ['HE CAP TO I HE BRINE MONITOI:�ING RISER. PROCEED TO THE NEXT TANK AND REPEAT (NEVER USE A <br /> ,�UFL S I-00K 1-0 WASURE BRINE LEVELS i RINSE OUT THE BAILOR AND STORE IT FOR THE NE=XT MONITORING <br /> IPERICI:� f ANK!�;THAT HAVE A r3RY DOUSLEWALL OR MONITOR THE DOUBLEWALL WITH ATG SIMPLY CHECK THE ATS. <br /> :�Step jlij+�i-.CORD THE STATUS EITHER PA;;S OR FAIL AFTER COMPARING THE ACTUAL BRINE INCHES TO THE <br /> Stop*4-4�J 100-'�,r, SURMrr FOR REVIE'l,I FROM THE TOOL BAR,AND FILE THE HAND-WRITTEN REPORT IN <br /> -, A Lz INCHES D-OBDT I IEET THE REQUIRED BRINE PARAMETERS FOR THAT LEVEL OF PRODU T <br /> CHF-5, OR IF THERE is PRODUCT I)EtEl�',TED INSIDE THE BRINE RESERVOIR. REEQR ,_QSPEC--EQ RELEA <br /> RV <br /> PRODUCT Ili ARE: REQUIRED BRINE PARAMETER IS- <br /> FROM 01 TO FROM <br /> '—TA'4'w——PROL UCT PROCUCT ACTUAL BRINE INCHES STATUS <br /> NUM3ER INCHES <br /> -jr—Pass Fall <br /> 0 Pass 0 Fall <br /> DRY ATG <br /> 0 Pass (D Fall <br /> 111 Pass 0 Fall <br /> F Mont6 <br /> o <br /> 031 <br /> DRY ATG <br /> )05 <br /> 0 Pass 0 Fall <br /> I 44 <br /> i DRY iL ATG <br /> 0 Pass 0 Fail <br /> Inches <br /> or <br /> ofi <br /> DRY 7— ATG <br /> inches <br /> or <br /> DRY El ATG <br /> mc«mm \ | <br />