Laserfiche WebLink
SWRCi,January 2002Page 5. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X❑ Tank Manufacturer FlIndustry Standard ❑ Professional Engineer <br /> Other (Specify) <br /> Test Method Used: �X Pressure Vacuum F� Hydrostatic <br /> Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 6 SUP SUP Piping Run# 5 PLU Piping Run# 5 PLU Piping Run# 4 UNL <br /> Piping Material: fiberglass fiberglass fiberglass fiberglass <br /> Piping Manufacturer: ameron ameron ameron ameron <br /> Piping Diameter: 311 311 311 311 <br /> Length of Piping Run: <br /> Product Stored: SUPREME PLUS PLUS UNLEADED <br /> Method and location of sump sump disp 5/6 sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 12 :10 11:11 12:50 11:50 <br /> Initial Reading(RI ): 3PSI 3PSI 3PSI 3PSI <br /> Test End Time: 13:10 12 :11 13 :50 12 :50 <br /> Final Reading(RF ): 3PSI 3PSI 3PSI 3PSI <br /> Test Duration: 1HR 1HR 1HR 1HR <br /> Change in Reading(RF-RI ): OPSI OPSI OPSI OPSI <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> unable to find site of failur from disp 5/6 to disp 16. die sump 1 , syphon line west <br /> failed because of eched secondary piping. secondary line from die sump 1 runs to the <br /> front side and the backside it failed at the boot in disp 19 on the back side. each <br /> disp. on the back side has a line run from that disp to its sat. sat 19 to disp 19 <br /> failed, unable to locate leak. sat 22 to disp 22 failed at boot in disp 22. sat 27 to <br /> disp 27 failed, unable to find leak. 8 blue line boots were installed. (see data) <br />