My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:45:25 PM
Creation date
6/23/2020 6:57:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 6. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: �X Tank Manufacturer Industry Standard ❑ Professional Engineer <br /> Other (Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 4 UNI' Piping Run# 1 DIE Piping Run# 1 DIE Piping Run# 1 DIE <br /> Piping Material: fiberglass fiberglass fiberglass fiberglass <br /> Piping Manufacturer: ameron ameron ameron ameron <br /> Piping Diameter: 311 311 311 4.511 <br /> Length of Piping Run: <br /> Product Stored: UNLEADED DIESEL DIESEL DIESEL <br /> Method and location of disp5/6 sump sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 13 :05 13 :57 10:12 9:19 <br /> Initial Reading(RI ): 3PSI 3PSI 3PSI 3PSI <br /> Test End Time: 14 :05 14:57 10:14 9:25 <br /> Final Reading(RF ): 1PSI 3PSI OPSI OPSI <br /> Test Duration: 1HR 1HR 2MIN 6MIN <br /> Change inReading(RF-RI ): 2PSI OPSI 3PSI 3PSI <br /> Pass/Fail Threshold or p 0 0 0 <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> unable to find site of failur from disp 5/6 to disp 16. die sump 1 , syphon line west <br /> failed because of eched secondary piping. secondary line from die sump 1 runs to the <br /> front side and the backside it failed at the boot in disp 19 on the back side. each <br /> disp. on the back side has a line run from that disp to its sat. sat 19 to disp 19 <br /> _ failed, unable to locate leak. sat 22 to disp 22 failed at boot in disp 22. sat 27 to <br /> disp 27 failed, unable to find leak. 8 blue line boots were installed. (see data) <br />
The URL can be used to link to this page
Your browser does not support the video tag.