Laserfiche WebLink
,SWRCB,January 2002Page 10 <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: X❑ Tank Manufacturer F-1 Industry Standard O Professional Engineer <br /> Other (Sped) <br /> Test Method Used: IX Pressure ❑ Vacuum ❑ Hydrostatic <br /> Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 DIE piping Run# 1 DIE piping Run# 1 DIE Piping Run# 1 DIE <br /> Piping Material: fiberglass fiberglass fiberglass fiberglass <br /> Piping Manufacturer: ameron ameron ameron ameron <br /> Piping Diameter: 311 311 311 311 <br /> Length of Piping Run: <br /> Product Stored: DIESEL DIESEL DIESEL DIESEL <br /> Method and location of sat disp 27 sat disp 28 sat disp 29 sat disp 30 <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 11:49 9:33 10:28 12 :06 <br /> Initial Reading(RI ): 3PSI 3PSI 3PSI 3PSI <br /> Test End Time: 11:57 10:33 11:2 8 13:06 <br /> Final Reading(RF ): OPSI 3PSI 3PSI 3PSI <br /> Test Duration: 8MIN 1HR 1HR 1HR <br /> Change in Reading(RF-RI ): 3PSI OPSI OPSI OPSI <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> NEEMEMi i ' i i ;; i i i , ii W=MW <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> unable to find site of failur from disp 5/6 to disp 16. die sump 1 , syphon line west <br /> failed because of eched secondary piping. secondary line from die sump 1 runs to the <br /> front side and the backside it failed at the boot in disp 19 on the back side. each <br /> disp. on the back side has a line run from that disp to its sat. sat 19 to disp 19 <br /> failed, unable to locate leak. sat 22 to disp 22 failed at boot in disp 22 . sat 27 to <br /> disp 27 failed, unable to find leak. 8 blue line boots were installed. (see data) <br />