My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:45:25 PM
Creation date
6/23/2020 6:57:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'SWRCB,January 2002 Page 11 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard 1X Professional Engineer <br /> El Other (Spec) <br /> Test Method Used: ❑ Pressure El Vacuum 1fl Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vPlt Equipment Resolution: vplt to gph <br /> Sump# 6 SUP Sump# 5 PLU Sump# 4 UNL Sump# 3 DIE <br /> Sump Diameter: 4811 4811 4811 4811 <br /> Sump Depth: 7' 7' 7' 71 <br /> Sump Material: fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 1611 1611 16 It 3211 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 441 4411 44" 4511 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good good good <br /> Portion of Sump Tested: 1 1811 1811 1811 3411 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X]Yes❑No�N Yes❑No�N Yes❑N�N Yes❑No�i <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe --'Yes <br /> ail-safe ❑ � ❑ � ❑ <br /> shutdown?* 1EYes N N X Yes N N X Yes N N X Yes No <br /> Was fail-safe verified to be ❑ ❑ ❑ ❑ � ❑ ❑ ❑ �T <br /> operational?* X Yes N N X Yes N N X Yes N N X Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5min 5min <br /> test: <br /> Test Start Time: 11:19 11:21 10:43 11:4 5 <br /> Initial Reading(R1): 9.743 5.694 2.624 7.294 <br /> Test End Time: 11:49 11:51 11:23 12:15 <br /> Final Reading(RF): 9.743 5.694 2.624 6.975 <br /> Test Duration: 3 OMIN 3 OMIN 3 OMIN 3 OMIN <br /> Change inReading(RF-R1 ): OOOGPH OOOGPH OOOGPH .02GPH <br /> Pass/Fail Threshold or Criteria: .05GPH .05GPH 05GPH .05GPH <br /> Was sensor removed for testing? X Yes N NA X Yes N NA X Yes N NA MYes No <br /> Was sensor properly replaced and Ye�N e�N NA❑X <br /> verified functional after testing? ❑YeN NA ❑ <br /> Yes N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> the last two sets of data are for trou eshooting on y. bubbles were seen at the <br /> siphion product west riser going in to the manway at the nut, in sump die 2. <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.