My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:45:25 PM
Creation date
6/23/2020 6:57:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'SWRCB,January 2002 Page 12 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: F-1 Sump Manufacturer F-1 Industry Standard �X Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: F] Pressure Vacuum Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used: vplt Equipment Resolution: vplt to gph <br /> Sump# 2 DIE Sump# 1 DIE Sump# 2 DIE Sump# 2 DIE <br /> Sump Diameter: 4811 48" " if <br /> Sump Depth: 71 71 " 11 <br /> Sump Material: fiberglass fiberglass 11 " <br /> Height from Tank Top to Top of 3211 32" " <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 4511 45" " <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good " <br /> Portion of Sump Tested: 1 3411 3411 2211 2" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X�Yes❑No❑N Yes�NoaN MYes❑No❑N �Yes D_No[1 <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe <br /> shutdown?* ❑Yes❑NoON Yes❑N`�N ❑X Yes[:]No[:]N ❑X Ye ❑N <br /> o aA <br /> Was fail-safe verified to be yes❑No[—]N Yes❑No❑N Yes❑No❑N EYes❑No❑t`T <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5MIN 5MIN <br /> test: <br /> Test Start Time: 14:09 10:12 14 :17 14:35 <br /> Initial Reading(Ri): 4.286 10.164 6.372 9.531 <br /> Test End Time: 14:11 10:42 14:19 15:05 <br /> Final Reading(RF): -13.000 9.836 -13 .000 9.531 <br /> Test Duration: 2MIN 30MIN 2MIN 30MIN <br /> Change in Reading(RF-Ri ): 1.3GPH .02GPH 1.5GPH OOOGPH <br /> Pass/Fail Threshold or Criteria: .05GPH .05GPH .05GPH .05GPH <br /> Was sensor removed for testing? R Yes N NA X Yes N X NA Yes NoE]NA X Yes❑No <br /> Was sensor properly replaced and F77-1 <br /> � ❑ � � ❑ E ❑ <br /> verified functional after testing? % Ye N NA R Ye N NA X Ye N NA X Yes N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> the last two sets of data are for troub es ooting only. bubbles were seen at the <br /> siphion product west riser going in to the manway at the nut, in sump die 2 . <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to my f the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.