Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FOR] <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 2 of 2 <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />® 1. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE 490-54a. <br />❑ 4. NO DISPENSERS ❑99.OTHER (Specify) 490-54b. <br />_-.____.._..._....._._..._._...._._....._....._._...._._._...---._.._.. <br />_. <br />LEAK MONITOR MANUFACTURER: VEEDER-ROOT 490-55. MODEL #: TLS -350 490.56. <br />LEAK SENSOR MANUFACTURER: VEEDER-ROOT 490-57. MODEL#(S): 208 490-58. <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a. YES ❑ b. NO 490.59. <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-60. <br />FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-61. <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a. YES ❑ b. NO 490-62. <br />_..._.........._._...__.____-._._.-.__..._.......__._. <br />_ __� _.. _._........._..........._._.._.._...__.............................__......._._._._.___._.-._._.._._._....._..._- <br />UDC CONSTRUCTION IS: ® 1. SINGLE WALL ❑ 2. DOUBLE WALL 490-63. <br />IF DOUBLE WALL: 490-64a. <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a. LIQUID ❑ b. PRESSURE ❑ c. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. NO 490-64b' <br />r W0,02 G <br />; <br />I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br />LEAK DErECTQXIELM MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. t23 CCR §2644.11 <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br />® 3. SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br />r , <br />The following monitoring/maintenance records are kept for this facility: 490-68. <br />® a. ALARM LOGS ❑ b. VISUAL INSPECTION RECORDS ❑ c. TANK INTEGRITY TESTING RESULTS <br />❑ d. SIR TESTING RESULTS (and supporting documentation records) ❑ e. TANK GAUGING RESULTS (and supporting documentation records) <br />❑ f. ATG TESTING RESULTS (and supporting documentation records) ❑ g. CORROSION PROTECTION 60 -DAY LOGS <br />0 h. EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490-69b. <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490-69c. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f. <br />STATISTICAL INVENTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g. <br />❑ OTHER (Specify): 490-69b. <br />490-69i. <br />® This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council 490-70• <br />(ICC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br />➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />Name(s) of contact person(s) for emergencies and monitoring alarms. <br />st r <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br />OFP- Butterfly val. installed in fill risers provide mech. overfill prevention at 95%. Audible & visual alarms. <br />The UST Owner/Operator is responsible for ensuring that: 1.) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br />bthis plan occurs; 2.Za11 conditions that indicate a possible release are investigated; and 3.) all monitoring records are maintained rp operly _ _ _ mm <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME: EDNA ARANDIA 490-72. TITLE: GENERAL MANAGER 490-73. <br />NAME: JOSE YEPEZ 490-74. TITLE: FACILITY MANAGER 490-75. <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow -!T action. <br />XII. Q WTWA10 R "TO GI�IATLiRE <br />izwi, <br />CERTIFICATION: I certify that the informatio rovided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE <br />DATE: 490-77. <br />Owner/Operator ❑ 3. Authorized Representative of Owner 490-76. <br />REPRESENTING EYL Tank Owner/ erator ❑ Facility <br />APPLICANT NAME (print): 490-78. <br />APPLICANT TITLE: 490-79. <br />JEFF LARSEN <br />DIRECTOR OF HS&E <br />UPCF UST -D (12/2007) - 4/6 www.unidoes.org <br />