Laserfiche WebLink
iJPCF UST -D (12/2007) - 3/4 www.unidoes.org <br />0 <br />-TED PROGRAM C'ONSO LAD A T E D FOR <br />U -NDE€ GROUND S'YORAGE F'ANK <br />NIONITORING PLAN - (Page 2 of 2) <br />all <br />VI. UNDER DISPENSER CONTAINMENT (L1DC) MONITORING- ha <br />aply) <br />ply) <br />- <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />® I. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />490-54a. <br />❑ 4. NO DISPENSERS ❑ 99.OTHER (Specify) <br />........................................... . ... ...... .... ..- ............ <br />490-54b. <br />LEAK MONITOR MANUFACTURER. VEEDER-ROOTIOMNTEC 490-55. MODEL #: TLS -350/800011 <br />490 56 <br />LEAK SENSOR MANUFACTURER: VEEDER-ROOT 490-57. MODEL #(S): 208 <br />490-58. <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a. YES ❑ b. NO <br />490-59. <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />490-60. <br />FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z a_ YES ❑ b. NO <br />490-61, <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. Z a. YES [Ib. NO <br />490-62. <br />... _................. ................... ............, <br />UDC CONSTRUCTION IS. ® L SINGLE WALL ❑ 2. DOLIBI,E WALL, <br />490-63. <br />IF DOUBLE WALL: <br />490-64a. <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a. LIQUID ❑ b. PRESSURE ❑ c. VACUUM <br />A LEAK WITHINTHE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. NO <br />440-64b. <br />VII. PERIODIC SYSTEM TESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />LEAK DETECTIONIELD) MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 123 CCR §2644.11 <br />Z 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS, <br />490-66. <br />Z 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />490-67. <br />VIII. RECORD KEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />490-68. <br />Z a. ALARM LOGS ❑ b. VISUAL INSPECTION RECORDS ❑ c. TANK INTEGRITY TESTING RESULTS <br />❑ d. SIR TESTING RESULTS (and supporting documentation records) ❑ e. TANK GAUGING RESULTS (and supporting documentation records) <br />❑ f. ATG TESTING RESULTS (and supporting documentation records) ❑ g. CORROSION PROTECTION 60 -DAY LOGS <br />® h. EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br />. T NG <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br />490-69a. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />490-696- <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />490-69c. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />490-69d. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490-69e, <br />STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />490-69f <br />STATISTICAL INVENTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />490-69g. <br />❑ OTHER <br />(Specify):490-69h. <br />----------- - - ... <br />Z This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />490-69i. <br />490-70. <br />(ICC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training will include, but is not limited to, the following: <br />Operation of the UST systems in a manner consistent with the facility's best management practices. <br />> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br />➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />> Name(s) of contact pemon(s) for emergencies and :monitoring alarms. <br />X. CONIN[ENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br />490-71. <br />OFP- Butterfly val. installed in fill risers provide mech. overfill prevention at 95%. Audible & visual alarms. <br />. PERSONNEL RESPONSIBILITIES -_ <br />The UST Owner/Operator is responsible for ensuring that: 1.) the daily/routine UST monitoring activities and maintenance. of UST leak detection equipment covered <br />by this plan occurs; 2.) all conditions that indicate a possible release are investigated; and 3.) all monitoring records are maintained properly. <br />..................__........ __.._.............................................................. <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME: EDNA ARANDIA 490-72. TITLE: GENERAL MANAGER <br />490-73. <br />NAME: JOSE YEPEZ 490-74. TITLE: FACILITY MANAGER <br />490-75. <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR OWNER/OPERATORSIGNATURE <br />CERTIFICATION: I certify t at the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE �- <br />DATE: <br />490-77. <br />!� <br />6/22/2069 <br />REPRESENTING: I. Tank 0%vner2perator ❑ 2. Facility Owner/operator ❑ 3. Authorized Representative of Owner 490-76. <br />APPLICANT NAME (print): 490-78. <br />APPLICANT TITLE: <br />490-79. <br />JEFFLARSEN <br />DIRECTOR OF HS&E <br />iJPCF UST -D (12/2007) - 3/4 www.unidoes.org <br />0 <br />