My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 3:56:53 PM
Creation date
6/23/2020 6:57:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r1 <br />IFIED PROGRAM CONSOLIDATED FO <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 2 of 2) <br />VI.'UNDER, DISPENSER DONT 'LENT (UDC) MONITORING(Checkall <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />® 1. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />490-54a. <br />❑ 4. NO DISPENSERS ❑ 99. OTHER (Specify) <br />490-54b. <br />.............................................................................................................................-........................................................................................................ <br />LEAK MONITOR MANUFACTURER: VEEDER-ROOT/OMNTEC490-55. MODEL #: TLS -350/800011 <br />490-56. <br />LEAK SENSOR MANUFACTURER: VEEDER-ROOT 490-57. MODEL #(S): 208 <br />490-55. <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. Z a. YES ❑ b. NO <br />490-59. <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z a. YES ❑ b. NO <br />49060. <br />FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z a. YES ❑ b. NO <br />490-61. <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. Z a. YES ❑ b. NO <br />................... ........... ........................................................................ ...................................................................... ............ ................ _._......... _..............................._..................................................................................................................................................................... <br />490-62. <br />............................ <br />UDC CONSTRUCTION IS: Z 1. SINGLE WALL ❑ 2. DOUBLE WALL <br />490-63. <br />IF DOUBLE WALL: <br />490-64a. <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a. LIQUID ❑ b. PRESSURE ❑ c. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. NO <br />490-64b. <br />VIII. "PERIODIC SYSTEM TESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. t23 CCR §2644.11 <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490-66. <br />Z 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />490-67. <br />;"'", VIa CO KEEPING <br />" <br />The following monitoring/maintenance records are kept for this facility: <br />490-68. <br />Z a. ALARM LOGS ❑ b. VISUAL INSPECTION RECORDS ❑ c. TANK INTEGRITY TESTING RESULTS <br />❑ d. SIR TESTING RESULTS (and supporting documentation records) ❑ e. TANK GAUGING RESULTS (and supporting documentation records) <br />❑ t: ATG TESTING RESULTS (and supporting documentation records) ❑ g. CORROSION PROTECTION 60 -DAY LOGS <br />Z h. EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br />�MA*APONG .. <br />Z Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br />490-69a. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />Z THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />490-69b. <br />Z OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />490-69c. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />490-69d. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490-69e. <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />490-69f. <br />STATISTICAL INVENTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />490-69g. <br />❑ OTHER (Specify): <br />490-69h. <br />490-69i. <br />Z This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />490-70. <br />(ICC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br />The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />➢ Name(s) of contact person(s) for emergencies and monitoring alarms. <br />'' X. CO � . ENTS/AI�OITIONAL INFO . ATION , ; <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br />490-71. <br />OFP- Butterfly val. installed in fill risers provide meth. overfill prevention at 95%. Audible & visual alarms. <br />The UST Owner/Operator is responsible for ensuring that: 1.) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br />and 3;) all monitoring records are maintained p...pro erl . .. <br />--......_....._..._ _. .........Y........................................................................... <br />by this plan occurs; 2.) all conditions that indicate a possible release are invONSIBLE <br />FOR PERFORMIestigated; <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME: EDNA ARANDIA 490-72• TITLE: GENERAL MANAGER <br />490-73, <br />NAME: JOSE YEPEZ 490-74. TITLE: FACILITY MANAGER <br />490-75. <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />Xii. ": O ' ; � , EItfCIPE TOR 53C�iATiJR� , ; <br />CERTIFICATION: I certify tjlat the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE 7 <br />DATE: <br />490-77. <br />6/22/2009 <br />REPRESENTING: 1. Tank Owner/ for ❑ 2. Facili[ (Tuner/ ator ❑ 3. Authorized R resentative of Owner 490-76. <br />APPLICANT NAME (print): 490-78. <br />APPLICANT TITLE: <br />490-79. <br />JEFF LARSEN <br />DIRECTOR OF HS&E <br />UPCF UST -D (12/2007) - 3/4 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.