My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 3:56:53 PM
Creation date
6/23/2020 6:57:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Test Method Developed By: <br />Page 3 of 7 <br />5. SECONDARY PIPE TESTING <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />® Pressure ❑ Vacuum <br />❑ Other (Specify) <br />❑ Hydrostatic <br />Test Equipment Used: Pressure Test Gauge <br />EM <br />Piping Run #sipho-1 Piping Run #sipho-2 <br />al: FRP FRP <br />rPiping <br />Equipment Resolution:+/- 0.1 PSI <br />Piping Run #sipho-3 Piping Run #sipho-4 <br />FRP FRP <br />facturer: <br />Smith <br />Smith <br />Smith Smith <br />iameter: <br />3"over 2" <br />Yover 2" <br />Yover 2" Yover 2" <br />Length of Piping Run: <br />12' <br />12' <br />12' 12' <br />Product Stored: <br />diesel <br />diesel <br />diesel diesel <br />Method and location of <br />piping -run isolation: <br />Test Boot <br />Test Boot <br />Test Boot Test Boot <br />Wait time between applying <br />pressure/vacuum/water and <br />test: <br />15 Minutes <br />15 Minutes <br />15 Minutes 15 Minutes <br />-starting <br />Test Start Time: <br />1:30 <br />1:30 <br />2:00 2:00 <br />Initial Reading (RI): <br />5 PSI <br />5 PSI <br />5 PSI 5 PSI <br />Test End Time: <br />2:30 <br />2:30 <br />3:00 3:00 <br />Final Reading (RF): <br />5 PSI <br />2 PSI <br />5 PSI 0 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour 1 Hour <br />Change in Reading (RF -RI): <br />0 PSI <br />3 PSI <br />0 PSI 5 PSI <br />Pass/Fail Threshold or <br />+/- 0.2 PSI <br />+/- 0.2 PSI <br />+/- 0.2 PSI +/- 0.2 PSI <br />[Criteria: <br />Test Result: ® Pass ❑ Fail ❑ Pass Z Fail Z Pass ; ❑ Fail ❑ Pass ® Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />**Diesel siphon line #1 , from tank #1 to # 2 passed pressure test. <br />**Diesel siphon line #2 , from tank #1 to # 2 Failed pressure test / test boot leaking in STP sump 1. <br />**Diesel siphon line #3 , from tank #2 to # 3 passed pressure test. <br />**Diesel siphon line, #4, from tank #2 to # 3 Failed pressure test / test boot leaking in STP sump 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.