Laserfiche WebLink
C�7 <br />SWRCB, January 2002 Page 4 of 7 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used:Incon TS -STS <br />Sump #1 Diesel STP Sump #213SL STP <br />Sump Diameter: 48" 48" <br />Equipment Resolution:+/- 0.0001" <br />Sump #3 DSL STP Sump # <br />48" <br />Sump Depth: 80" <br />77" <br />77" <br />Sump Material: FRP <br />FRP <br />FRP <br />Height from Tank Top to Top of 33" <br />Highest Piping Penetration: <br />31" <br />24" <br />Height from Tank Top to Lowest 48" <br />Electrical Penetration: <br />51" <br />49" <br />Condition of sump prior to testing: Clean <br />Clean <br />Clean <br />Portion of Sump Tested' 2" above highest pipe pen <br />2" above highest pipe pen <br />2" above highest pipe pen <br />Does turbine shut down when <br />sump sensor detects liquid (both ®Yes []No ❑ NA <br />product and water)?* <br />®Yes [:]No ❑ NA <br />®Yes ❑No❑ NA <br />❑Yes ❑No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe ®Yes ❑No ❑ NA <br />shutdown?` <br />®Yes ❑No ❑NA <br />®Yes [:]No ❑NA <br />❑Yes []No [:INA <br />Was fail-safe verified to be ❑Yes [:]No ®NA <br />o erational?* <br />❑Yes []No ®NA <br />❑Yes [-]No ®NA <br />❑Yes ❑No ®NA <br />Wait time between applying <br />pressure/vacuum/water and starting 15 Minutes <br />test: <br />15 Minutes <br />15 Minutes <br />Test Start Time: 1:49 2:07 <br />1 12:51 1:08 <br />2:25 2:47 <br />Initial Reading (Rt): 4.8871 4.8871 <br />4.0296 4.0254 <br />4.7255 4.7234 <br />Test End Time: 2:04 2:22 <br />1:06 1:23 <br />2:40 3:02 <br />Final Reading (RF): 4.8873 4.8869 <br />4.0284 4.0241 <br />4.7250 4.7222 <br />Test Duration: 15 Min Each(30)min <br />15 Min Each(30)min <br />15 Min Each(30)min <br />Change in Reading (RF -RI): 0.0002 0.0002 <br />0.0012 0.0013 <br />0.0005 0.0012 <br />Pass/Fail Threshold or Criteria: +/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />Test Result: ® Pass; ❑ Fail <br />El Pass ❑ Fail <br />® Pass ❑ Fail <br />❑; Pass ❑ Fail <br />Was sensor removed for testing? ®Yes [:]No ❑NA <br />®Yes [-]No [INA <br />®Yes [-]No [-INA <br />❑Yes ❑No ❑NA <br />Was sensor properly replaced and ®yes ❑No [INA <br />IL verified functional after testing? <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No [_]NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Tank #1,2 & 3 Truck Diesel STP sump All passed Hydrostatic test. <br />t If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />