My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 3:56:53 PM
Creation date
6/23/2020 6:57:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 7 of 7 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used:Incon TS -STS Equipment Resolution:+/- 0.0001" <br />Spill Box #871111 Spill Box #87vapor Spill Box #91fill Spill Box #91vapor <br />ameter: <br />rBucket <br />12" 12" 12" 12" <br />epth: <br />12" 12" 12" 12" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes 15 Minutes 15 Minutes 15 Minutes <br />Test Start Time: <br />4:59 2:50 12:31 1:50 <br />Initial Reading (RI): <br />5.8800 7.0775 7.1650 7.1059 <br />Test End Time: <br />5:14 3:05 12:47 2:05 <br />Final Reading (RF): <br />5.8792 7.0780 7.1649 7.1050 <br />Test Duration: <br />15 Min Ea(30 Min) 15 Min Ea(30 Min) 15 Min Ea(30 Min) 15 Min Ea(30 Min) <br />Change in Reading (RF -RI): <br />0.0008 0.0005 0.0001 0.0009 <br />Pass/Fail Threshold or <br />Criteria: <br />+/-0.002" +/- 0.002" +/- 0.002" +/- 0.002" <br />Test Result: ® Pass El Fail ® Pass ❑ Fail -® Pass < El - Fail ®Pass ❑Fait <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />** Unleaded 87 and Premium 91 Fill/Vapor buckets all passed hydrostatic test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.