Laserfiche WebLink
6 t <br /> Voice: (209) 953-7699 <br /> From: Holly Mendez [mailto:holly@jonescovey.com] <br /> Sent:Thursday, August 07, 2014 2:35 PM RECEIVED <br /> To: Elena K. Manzo [EH] <br /> Cc: Joe Zapotoczny SSP <br /> Subject: RE: PFJ #618 Ripon 2014 <br /> ENVIRONMENTL <br /> T`M <br /> HEALTH <br /> 7- <br /> Hello Elena, <br /> Ok here is the list of things that will need to be witnessed. Everything else was just <br /> putting boots on. Glenn did tell me to ask you if you needed another addendum for <br /> penetration that had to be repaired on the electrical and syphon on tank 1 during pre- <br /> test? Please let me know, I would like to start testing on the 1911 and do all the witnessed <br /> on the 2011 if that is ok. <br /> Components to be witnessed: <br /> Tl, T2 and T3 had to have the existing steel annular space risers with AO Smith fiberglass <br /> risers <br /> T3 siphon piping had a penetration repaired <br /> So it would be a total of 5 components to be witnessed and that is including the <br /> additional issue we found during pretest. Please get back to me ASAP. Thank you <br /> golf# V. <br /> Environmental Compliance <br /> Jones Covey Group, Inc. <br /> (888) 972-7581 xt. 205 <br /> (909) 229-2932 Cell <br /> (909)484-0300 Fax <br /> 4 laaow04C <br /> Website:WWWJOBOBCMY.COM <br /> 4K <br /> From: Holly Mendez <br /> Sent:Wednesday,August 06,2014 9:12 AM <br /> To: 'Elena K. Manzo [EH]' <br /> Cc:Joe Zapotoczny <br /> Subject: RE: PFJ#618 Ripon <br /> Hello Elena, <br /> 3 <br />