Laserfiche WebLink
1 am workingwith the construction department this morning to et a list of the <br /> P g g <br /> components that were repaired so we can do those witnessed with you on the 2011 and <br /> start testing everything else that just needed boots on the 19th. I will get back to you <br /> ASAP. <br /> sl d4 D. <br /> Environmental Compliance <br /> Jones Covey Group, Inc. RECEIVED <br /> (888) 972-7581 A. 205 - <br /> (909) 229-2932 Cell <br /> (909)484-0300 Fax SEP, 10 2014 <br /> ENVIRONMENTAL <br /> DEPARTMENT <br /> We enesceYeMem <br /> From: Elena K. Manzo [EH] [mailto:emanzoC@sicehd.com] <br /> Sent: Monday,August 04,2014 4:29 PM <br /> To: Holly Mendez <br /> Subject: RE: PFJ#618 Ripon <br /> Hi Holly, <br /> Can you test the permit relater repaired components on the 20th and not on the 199"?Are they using <br /> Incon? I need to witness that portion of your testing, on the sump where the penetrations were replaced. <br /> For right now I don't have anything scheduled that day. <br /> Sincerely, <br /> Elena K. Manzo, REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 E. Hazelton Ave. <br /> Stockton, CA 95205-6232 <br /> Voice: (209) 953-7699 <br /> From: Holly Mendez [mailto:holly@jonescovey.com] <br /> Sent: Monday, August 04, 2014 4:05 PM <br /> To: Elena K. Manzo [EH] <br /> Subject: RE: PFJ #618 Ripon <br /> Hello Elena, <br /> Yes I believe that is the only permit we have open. There is a bunch of testing so it <br /> will be a 2 day test and we will need to pull the boots back so possibly going into <br /> 3 days. Can we start on the 19th we will still be on site for sure the next 2 <br /> days? We also have a 6-month retest for (The three existing diesel lines will need to <br /> 4 <br />