Laserfiche WebLink
RECEIVED <br /> SWRCB,January 2002 S <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard -05NVQQN MENFAL <br /> ❑Other(Spec) DEPARTMENT <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> 11 Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> Piping Run#T#5-91 Piping Run# Satl 9 Piping Run# Sat 20 Piping Run# Sat 21 <br /> rPipingaterial: Fiberglass Fiberglass Fiberglass Fiberglass <br /> anufacturer: Smith Smith Smith Smith <br /> Piping Diameter: Y Y Y 3" <br /> Length of Piping Run: 300' 15' 15" 15" <br /> Product Stored: 91 unleaded Diesel Diesel Diesel <br /> Method and location of STP to Auto UDC's Sat 19 to 19 main Sat 20 to 20 main Sat 21 to 21 main <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 10:35 am 11:00am 11:05 am 11:10 am <br /> Initial Reading(Ri): 5.00 psi 5.00 psi 5.00 psi 5.00 psi <br /> Test End Time: 11:35 am 12:00 pm 12:05 pm 12:10 am <br /> Final Reading(RF): 5.00 psi 5.00 psi 5.00 psi 5.00 psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0.00 psi 0.00 psi 0.00 psi 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi 0.00 psi 0.00 psi 0.00 psi <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ®Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />