My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 4:36:01 PM
Creation date
6/23/2020 6:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2014-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> SWRCB,January 2002 S E P of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard I i <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum f_I Hydrostatic <br /> C1 Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> Piping Run# Sat 22 Piping Run# Sat 23 Piping Run# Sat 24 Piping Run# Sat 25 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" Y Y Y <br /> Length of Piping Run: 15' 15' 15' 15' <br /> Product Stored: Diesel Diesel Diesel Diesel <br /> Method and location of Sat 22 to Main 22 Sat 23 to Main 23. Sat 24 to Main 24. Sat 25 to Main 25. <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 11:30 am 11:35 am 11:45 am 11:50 am <br /> Initial Reading(Rj): 5.00 psi 5.00 psi 5.00psi 5.00 psi <br /> Test End Time: 112:30pm 12:35pm 12:45 pm 12:50 pm <br /> Final Reading(RF): 5.00 psi 5.00 psi 5.00psi 5.00 psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 Hour <br /> Change in Reading(RF-R,): 0.00 psi 0.00 psi 0.00 psi 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi 0.00 psi 0.00 psi 0.00 psi <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.