Laserfiche WebLink
RECEIVED <br /> SWRCB,January 2002 S E P of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard I i <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum f_I Hydrostatic <br /> C1 Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> Piping Run# Sat 22 Piping Run# Sat 23 Piping Run# Sat 24 Piping Run# Sat 25 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" Y Y Y <br /> Length of Piping Run: 15' 15' 15' 15' <br /> Product Stored: Diesel Diesel Diesel Diesel <br /> Method and location of Sat 22 to Main 22 Sat 23 to Main 23. Sat 24 to Main 24. Sat 25 to Main 25. <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 11:30 am 11:35 am 11:45 am 11:50 am <br /> Initial Reading(Rj): 5.00 psi 5.00 psi 5.00psi 5.00 psi <br /> Test End Time: 112:30pm 12:35pm 12:45 pm 12:50 pm <br /> Final Reading(RF): 5.00 psi 5.00 psi 5.00psi 5.00 psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 Hour <br /> Change in Reading(RF-R,): 0.00 psi 0.00 psi 0.00 psi 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi 0.00 psi 0.00 psi 0.00 psi <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />