Laserfiche WebLink
RECEIVED <br /> SWRCB,January 2002 SEP 104814 of <br /> 5. SECONDARY PIPE TESTING I=P IMM <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard <br /> ❑Other(Spec) DEPARTMENT <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> Piping Run# Sat 30 Piping Run# DT#6 Piping Run# Piping Run# <br /> rNipingManufacturer: <br /> : Fiberglass Fiberglass <br /> Smith Smith <br /> Piping Diameter: 3" 43" <br /> Length of Piping Run: 15' 325' <br /> Product Stored: Diesel Diesel <br /> Method and location of Sat 30 to Main 30 Diesel Tank#6 to UDC <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 2:30 pm 4:00 pm <br /> Initial Reading(Ri): 5.00 psi 5.00 psi <br /> Test End Time. 3:30 pm 5:00 pm <br /> Final Reading(RF): 5.00 psi 5.00 psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0.00 Psi 0.00 Psi <br /> Pass/Fail Threshold or 0.00 Psi 0.00 Psi <br /> Criteria: <br /> Test Result: ® Pass ❑Fail 9 Pass- ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />