My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 4:36:01 PM
Creation date
6/23/2020 6:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2014-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 RECEIVED <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer 9 Industry Standard 1-1 Pro ' n <br /> I J Other(Spec) " <br /> Test Method Used: ❑Pressure 1-1 Vacuum EN!69MAENTAL <br /> ❑Other(Spec) DEPARTMENT <br /> Test Equipment Used: Incon Incon TS-STS Tester Equipment Resolution: +/-0.002" <br /> Sump# STP 1 Sump# STP 2 Sump# STP 3 Sump# <br /> rSumpDiameter: 42" 42" 42" <br /> Depth: 75" 72" 73" <br /> umpMaterial: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 23" 20" 13" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 43" 44" 43" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 47" 48" 47" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No 9 NA ❑Yes ❑No X NA ❑Yes ❑No J NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes ❑No k NA ❑Yes []No X NA ❑Yes F]No X NA [1Yes []No X NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑yes [-]No k NA ❑Yes [.]No X NA ❑Yes []No K NA [-]Yes ❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 115 minutes 15 minutes 15 minutes <br /> test: <br /> Test Start Time: 9:12 am 9:47am 4:01 pm 4:19 pm 2:00 pm 2:17 pm <br /> Initial Reading(RI): 5.6419" 5.6368" 5.3728" 5.3731" 4.9554" 4.9559" <br /> Test End Time: 9:27 am 10:02 am 4:16 pm 4:34am 2:15 pm 2:32pm <br /> Final Reading(RF): 5.6406" 5.6355" 5.3730" 5.3730" 4.9550" 4.9558" <br /> Test Duration: 15 Minutes Each (30) 15 Minutes Each (30 15 Minutes Each (30 <br /> Change in Reading(RF-RI): -0.0013 -0.0013 0.0002 -0.0001 -0.0004 -0.0001 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" ++/-0.002 +/-0.002' +/-0.002" /-0.002" +/-0.002" +/-0.002" <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? k,Yes ❑No ❑NA 9 Yes ❑No `,`_NA 9 Yes ❑No ❑NA ❑Yes ❑No LK NA <br /> Was sensor properly replaced and k Yes ❑No ❑NA 91 Yes ❑No 7,NA x Yes ❑No ❑NA ❑Yes ❑No ®NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to as of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.