My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 4:36:01 PM
Creation date
6/23/2020 6:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2014-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TP 20103 <br /> UST Static Pressure Performance Fest Report Form <br /> Permit Number: Test Company:Jones Covey Group, Inc. <br /> Site Name: Flying J Ripon Technician: lssac Garcia <br /> Site Address: 1501 N. Jacktone rd �— Certification Number Expiration Date <br /> rCity: Ripon j Lip: District: SJV-0264 6:30 am <br /> Date/Time of Test: 3/19/14 8:45 am 1 <br /> TEST INFORMATION <br /> Total number of nozzles: 16 Are the tanks manifolded? ® Yes ❑ No 1 <br /> Phase I vapor recovery system executive order(as referenced on Permit to Operate) Phil-rite Dual Point <br /> Phase II vapor recovery system executive order(as referenced on Permit to Operate) Healy Assist j <br /> Nitrogen introduction point N Phase I vapor coupler ❑ Phase II vapor riser <br /> Pressure measuring device ❑ incline manometer ® digital manometer I ❑ mechanical gatige <br /> Calibration date for pressure measuring device(must be within 90 days of the test) 2/25/14 <br /> Endin__value for digital manometer drift test if applicable(must be 0.01 in. w.c.or less) 10.00 <br /> Initial tank tillage pressure(vent if over 0.5 in.w.c.) 3.43 1 <br /> Nitrogen introduction flow rate,F(must be between 1 and 5 CFN4) 3 <br /> Calculated tillage fill-time,t(t,=V/1522 x f) 15 min 47 sec <br /> I Actual fill-time _ 31 min 34 sec <br /> Number of hoses with over 100 ml(balance hoses must be drained prior to testing) N/A <br /> ----— TANK INFORMATION <br /> 1-ank No. 1 , 4 �� ALL <br /> Product grade 87 191 <br /> Actual tank capacity(gallons) 12479 11849 124328 <br /> Gasoline volume(gallons) 6297 12981 9278 <br /> Ullage,V(gallons) 15552 18868 14420 <br /> If tanks are not manifolded,number of nozzles I N/A I N/A N/A N/A li N/A <br /> 2 IN. W.C. S'TA'TIC PRESSURE TEST <br /> Test No. 1 2 3 — 5 <br /> Start time 8:45 am _ <br /> Initial Pressure, inches of water column(in. w.c.) 10.00 <br /> Pressure at one minute. in.w.c. 10.00 <br /> Pressure at two minutes, in. w.c. 9.99 <br /> —� <br /> Pressure at three minutes,in.w.c. _ 9.99 � <br /> Pressure at four minutes,in.w.c. _ 9.98 <br /> Pressure at five minutes. in.w.c. 9-97 <br /> Allowable minimum pressure,in.w.c. 9-90 <br /> Pass/Fail (enter"C3 F for gross failure) Pass I <br /> ----1--- – --L <br /> I declare, miner penalo;of petjzvy under the latus of the state of California that based on information and belief formed <br /> after reasonable inphy, the statements and infprmation nrovided in this doc-ument are ii-Ice, accurate, and complete. <br /> Signature of Technician: - �` - Date: 3/19/14 <br /> JUN 2014 <br /> EWIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.