Laserfiche WebLink
TP 20103 <br /> UST Static Pressure Performance Test Report Form <br /> Permit Number: Test Company: Jones Covey Group; Inc. <br /> Site dame: Pilot#618 Technician: <br /> Site Address: 1501 N. Jacktone rd Certification Number Expiration Date I <br /> City: Ripon Zip: 95366 District: SJV-0264 6/30/15 <br /> Date!Time of Test: 3/13/14 6:45 pm <br /> TEST INFORMATION j <br /> Total number ofnozzies: 16 Are the tanks manifolded? ® Yes ❑ No <br /> Phase I vapor recovery system executive order(as referenced on Permit to Operate) Phil-Tite Dual Point <br /> Phase II vapor recovery system executive order(as referenced on Permit to Operate) Healy Assist <br /> Nitrogen introduction point ® Phase I vapor coupler ❑ Phase II vapor riser j <br /> Pressure measuring device ❑ incline manometer ® digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device(must be within 90 days ofthe test) 2/25/14 <br /> Ending value for digital manometer drift test if applicable(must be 0.01 in.w.c.or less) 0.00 <br /> Initial tank ullage pressure(vent ifover 0.5 in. w.c.) 2.13 <br /> Nitrogen introduction flow rate,F(must be between 1 and 5 CFM) 3 <br /> Calculated tillage fill-time,t_(t�=V 1 1522 x F) 112 min 57 sec <br /> Actual fill-time 13 min 54 sec <br /> Number of hoses with over 100 ml(balance hoses must be drained prior to testing) 0 j <br /> _ <br /> TANK INFORMATION <br /> Tank No. 1 1 2 3 4 ,I ALL <br /> Product grade 87 191 <br /> Actual tank capacity(gallons) 11849 .11849 J23698 <br /> Gasoline volume(gallons) 2330 19535 1111865 <br /> Ullage, V(gallons) 9519 ,2314 1 11833 <br /> If tanks are not manifolded,number of nozzles <br /> 2 IN. W.C. STATIC PRESSURE TEST <br /> Test No. 1 2 3 4 <br /> Start time 6:45 pm <br /> Initial Pressure, inches of water column(in,w_c) 10.00 <br /> Pressure at one minute,in.w.c. 9.99 _ <br /> Pressure at two minutes,in.w.c. 9.97 <br /> Pressure at three minutes,in.w.c. 9.96 <br /> Pressure at four minutes,in.w.c. 9.95 —� <br /> Pressure at five minutes,in.w.c. 9-95 <br /> Allowable minimum pressure,in.w.c. g.gQ <br /> Pass/Fail (enter"GF"for gross failure) Pass <br /> 1 declare, under penalty of petjuty under the laws of the state of Califoinia that based on information and belief formed <br /> after reasonable inquity, the statements and infortnalion provided in this document al-e true, ace t r c LIVED ' <br /> Siallature of Technician: "" Date: 3/13/14 <br /> JUN 16 2014 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br />