My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vj <br />SWRCB, January 2002 DEC 2016 page14 of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: 0 Piping Manufacturer 91 Industry Standard "7 ineer <br />0 Other (Specify) Ei <br />Test Method Used: 11 Pressure Cl Vacuum L)c-l" 'UH�7-yd.rostatic <br />Test EquipmentGauge D Other (Specify) <br />Equipment Resolution: +/-0.25 <br />MEMO= <br />Piping Run # T#1 DR Piging Run #T#487 Piping Run #T#5911Piping Run #T#6D""li <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />1275' <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />41- <br />3" <br />an <br />31f <br />Length of Piping Run: <br />300' <br />300' <br />325' <br />Product Stored: <br />Diesel <br />Unleaded 87 <br />Premium 91 <br />Diesel <br />Method and location of <br />pjin -run isolation: <br />STP 1 to RV UDC's <br />STP to Auto UDC's <br />STP to Auto UDC's <br />STP to Auto UDC's <br />Wait time between applying <br />Pressure/vacuum/water and <br />starting test: <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />Test Start Time: <br />08:15am <br />08:30am <br />08:45am <br />08:45arn <br />Initial Reading (114): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />Test End Time: <br />09:30arn <br />09:30am <br />09:45arn <br />09:45am <br />Final Reading (RF): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />psi <br />Test Duration: <br />I hour <br />I hour <br />—.5.0 <br />1 hour <br />1 hour <br />Change in Reading (R,--Rj): <br />0.0 psi <br />0.0 psi <br />0.0 psi <br />0.0 psi <br />Pass/Fail Threshold or <br />.Crit.eria.:, <br />0.0 psi <br />0.0 psi <br />0.0 psi <br />0.0 psi <br />..77777 <br />TesfoiiWt: <br />Ss El Fail <br />11 Pass <br />Comments — (include information on repairs made <br />prior to testing, and TE2ETTAd follow-up for failed tests) <br />**KEY" <br />T#1 DRV (Diesel T#1 Diesel RV secondary) T#4 87 (87 Tank #4 secondary) T#5 91 (91 Tank #5 secondary) TO D <br />(Didsel I anK #6 secondary) <br />
The URL can be used to link to this page
Your browser does not support the video tag.