Laserfiche WebLink
ZZ) <br />SWRCB, January 2002 DEC 0 92016 Page�of <br />5- SWONDARV PIPF. TIW..QTTTVV- <br />Test Method Developed By: <br />1 <br />D Piping Manufacturer VQ InduT <br />0 Other (Specify) I <br />j "A <br />* t ngmeer <br />x <br />Test Method Used: <br />IN Pressure 11 Vacuum <br />0 Other (Spew) <br />0 Hydrostatic <br />[Test Equipment Used: Analog <br />Piping Material: <br />Gauge <br />Piping Run # S -T1 -T2 <br />Fiberglass <br />Equipment Resolution: +1-0.25 <br />Piping Run # S -T2-T3 Piping Run # T#2 Piping Run# T#3 <br />Fiberglass Fiberglass Fiberglass <br />Piping Manufacturer. <br />Unknown <br />Unknown <br />Unknown Unknown <br />Piping Diameter. <br />3" <br />310 <br />Length of Piping Run: <br />15, <br />15, <br />15, 15, <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel Diesel <br />Method and location of <br />piping -run isolation: <br />STP I to STP 2 <br />STP 2 to STP 3 <br />STP 2 to Trans STP 3 to Trans <br />Wait time between applyingi <br />pressure/vacuum/water and <br />Aadhig test: <br />15 minutes <br />15 minutes <br />15 minutes 15 minutes <br />Test Shirt Time <br />10:00arn <br />10:30arn 10:30arn <br />Initial Reading (P4): <br />5.0 psi <br />5.0 psi <br />5.0 psi 5.0 psi <br />Test End Time: <br />1 1:00arn <br />1 1:00arn <br />11:30arn 11:30am <br />Final Reading (RF): <br />5.0 psi <br />5.0 psi <br />5.0 psi 5.0 psi <br />Test Duration: <br />1 hour <br />I hour <br />I hour I hour <br />Change in Reading (RF -RI): <br />0.0 psi <br />0.0 psi <br />0.0 psi 0.0 psi <br />Pass/Fail Threshold or <br />Criteria: <br />0.0 psi <br />0.0 psi <br />0.0 psi 0.0 psi <br />Test Result: <br />:..;Im::Pass .,p*-.l1Fail .:'..j <br />IM Pass -0 Fail <br />Comments — (include infonnation on repairs made prior to testing, and recommended follow-up tests) <br />**KEY** T#2 (Diesel T#2 to Trans secondary) T#3 (Diesel T#3 to Trans secondary) S -T1 -T2 (Siphon T#1 to T#2 <br />secondary) S -T2-T3 (Siphon T#2 to T#3 secondary) <br />