Laserfiche WebLink
SWRCB, January 2002 <br />DEC 0 8 2016 Pageofia.- <br />6. PIPING SUMP TESTING , ;, r <br />ri <br />Test Method Developed By: ❑ Sump Manufacturer ® Indus �K V — � 44d it Engineer <br />❑ Other (Spec) "� p1I r' 3 t <br />Test Method Used: ❑ Pressure ❑ Vacuum iB Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: INCON- TS -STS Rmiinmwnt R,+enh,h;nn• Lin nwy, <br />COmments — (include i4formation on repairs madeprlor to testing{, and recommended follow-upfor failed tests) <br />***Key*** 91 - T#5 (Tank#5 91 STP) D -T#6 (Tank #6 Diesel STP) <br />**'Tank #5 and Tank #6 failed hydrostatic test due to torn 3/4" electrical penetrations' <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk M is "NO" or "NX , the entire sump must be tested. (See SWRCB LG -160) <br />Sump # 91 -T#5 <br />Sump # D -T#6 Sump # Sump # <br />Sump Diameter: <br />42" <br />42" <br />Sump Depth: <br />78" <br />78" <br />Sump Material:. <br />Fiberglass <br />Fi <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />7" <br />811 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />7011 <br />71" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Portion of Sump Tested' <br />72" <br />73" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />❑ Yes ❑No <br />3 NA <br />11 Yes <br />❑ No [BNA ❑ Yes U No a NA U Yes U No 99 NA <br />product and water ?' <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?` <br />11 I' C�To <br />NA <br />❑Yes <br />❑ No Ri NA ❑Yes ❑ No NA ❑Yes ❑ No ®NA <br />Was fail-safe verified to be <br />o erational?* <br />13 Yes ❑No <br />[RNA <br />❑Yes <br />❑No ONA []Yes ❑No EBNA ❑Yes ❑No INNA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (Re): <br />Test Duration: <br />Change in Reading (RF -N: <br />Pass/Fail Threshold or Criteria: <br />Te�t.Result <br />Ll Pass . W Fail <br />0 Pass :: tig Fall 0 Pass R Fail %'O Pass . ❑ Fail <br />Was sensor removed for testing? <br />❑ Yes [No <br />IN NA <br />Q Yes <br />❑ No ®NA ❑ Yes ❑ No INA ❑ Yes ❑ No Ill NA <br />Was sensor properly replaced and <br />verified functional after, ? <br />❑ Yes ❑No <br />[BNA <br />❑ Yes <br />ElNo .11 IB NA ❑ Yes [iNo ug NA D Yes ❑ No ®NA <br />COmments — (include i4formation on repairs madeprlor to testing{, and recommended follow-upfor failed tests) <br />***Key*** 91 - T#5 (Tank#5 91 STP) D -T#6 (Tank #6 Diesel STP) <br />**'Tank #5 and Tank #6 failed hydrostatic test due to torn 3/4" electrical penetrations' <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk M is "NO" or "NX , the entire sump must be tested. (See SWRCB LG -160) <br />