Laserfiche WebLink
` L <br />Sump Diameter: <br />42" <br />41" <br />42" <br />43" <br />Sump Depth: <br />75" <br />73" <br />73" <br />71" <br />Sump Material: <br />Fiberglass <br />Fi <br />Height from Tank. Top to Top of <br />Highest Piping Penetration: <br />23" <br />19" <br />13" <br />5" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />43" <br />44" <br />43" <br />41" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of Sump Tested' <br />70" <br />67" <br />68" <br />66" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />roduct and water)?' <br />O Yes ONo W NA <br />❑ Yes ONo [ANA <br />O Yes ONo <br />IMNA n Yes ❑ No !g NA <br />Turbine shutdown response time <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />Is system programmed for fail-safe <br />shutdownf <br />O Yes ONo bU NA <br />DYes U No G9 NA <br />D Yes D No <br />V NA O Yes O No lig NA <br />Was fail-safe verified to be <br />-operational?' <br />O Yes ONo W NA <br />fl Yes ❑ No [m NA <br />O Yes ❑ No <br />a NA ❑ Yes ❑ No !g NA <br />Wait time between apply <br />pressure/vacuum/water and starting <br />test: <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />Test Start Time: <br />01:31 pm <br />12:17pm <br />10:06am <br />11:07am <br />Initial Reading (Ri): <br />1.8402 <br />4.0741 <br />3.3252 <br />4.6969 <br />Test End Time: <br />01:46pm <br />12:32pm <br />10:21 pm <br />11:22am <br />Final Reading (Rr): <br />1.8402 <br />4.0740 <br />3.3271 <br />4.6964 <br />Test Duration: <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />Change in Reading (Rg-RI): <br />0.0000 <br />-0.0001 <br />+0.0019 <br />-0.0005 <br />Pass/Fail Threshold or Criteria: <br />+/-0.002" <br />+/-0.002" <br />+/-0.002" <br />+/-0.002" <br />Test Result <br />.Pass Fail :` <br />( Pass :. Q Fail, .. <br />I� .]°ass : D Fail Pass ..Q Fail <br />Was sensor removed for testing? <br />w Yes ONO O NA <br />M Yes ❑ No ❑ NA <br />[ayes ONo <br />❑ NA l9 Yes ❑ No O NA <br />Was sensor properly replaced and <br />verified functional after lectin ? U1 Yes ONo O NA W Yes OND ❑ NA 11 Yes OND <br />Comments — (include information on repairs made prior to testing and recommended follow-up <br />❑ NA !s Yes ❑ No DNA <br />forfalled tests) <br />_ <br />**KEY** D -T#1 (Tank #1 Diesel STP) D -T#2 (Tank#2 Diesel STP) D -T#3 (Tank #3 Diesel STP) 87-T#4(Tank #4 87 STP) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to gti}n ( of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LQ -160) <br />