My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 10:45:06 AM
Creation date
6/23/2020 6:57:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 8 of 12 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer IX Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum 9 Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON-TS-STS Equipment Resolution: +/-0.002" <br /> 742" <br /> 1 Sump# D-T#2 Sump# D-T#3 Sump# 87-T#4 <br /> Sump Diameter: 41" 42" 43" <br /> Sump Depth: 73" 73" 71" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 23" 19" 13" 5" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 43" 44" 43" 41" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' 70" 67" 68" 66" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No x NA ❑Yes ❑No ®NA ❑Yes ❑No ©NA ❑Yes ❑No ©NA <br /> product and water)?* <br /> Turbine shutdown response time 15 minutes 15 minutes 15 minutes 15 minutes <br /> Is system programmed for fail-safe I ,yes ❑No NA []YesElNo C'NA C]Yes No X NA r Yes ❑No X NA <br /> shutdown?* <br /> Was fail-safe verified to be <br /> -I Yes ❑No Fc NA ❑Yes ❑No NA 0Yes ❑No DNA ❑Yes :1No X NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes 15 minutes 15 minutes 15 minutes <br /> test: <br /> Test Start Time: 01:31 pm 12:17pm 10:06am 11:07am <br /> Initial Reading(RI): 1.8402 4.0741 3.3252 4.6969 <br /> Test End Time: 01:46pm 12:32pm 10:21 pm 11:22am <br /> Final Reading(RF): 1.8402 4.0740 3.3271 4.6964 <br /> Test Duration: 15 minutes 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-RI): 0.0000 -0.0001 +0.0019 -0.0005 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: ® Pass ❑Fail K Pass ❑Fail ® Pass ❑Fait K Pass ❑Fail <br /> Was sensor removed for testing? k Yes []No ❑NA X Yes ❑No ❑NA 9 Yes ENo NA I X Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testin ? Yes ❑No E,,NA z Yes ❑No Ll NA Yes 11 No ❑NA Yes ❑No ❑NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> **KEY** D-T#1 (Tank#1 Diesel STP) D-T#2 (Tank#2 Diesel STP) D-T#3(Tank#3 Diesel STP) 87-T#4(Tank#4 87 STP <br /> ii <br /> T <br /> ENI DEPARTMENT <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to as of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.