My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 10:45:06 AM
Creation date
6/23/2020 6:57:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 9 of 12 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON-TS-STS Equipment Resolution: +/-0.002" <br /> Sump# 91 -T#5 Sump# D-T#6 Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 78" 78" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 7„ 8„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 70" 71" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' 72" 73" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No 9 NA ,_!Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X1 NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?' <br /> Ll ❑No k NA --Yes ❑No X NA ❑Yes ❑No ®NA ❑Yes ❑No ©NA <br /> Was fail-safe verified to be 7F]Yes ❑No I-*NA Yes ❑No X NA I I Yes E,No X NA --Yes .n,No IK NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ❑ Pass ®Fail ❑ Pass ®Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No i,NA ❑Yes ❑No ©NA ❑Yes ❑No 9 NA ❑Yes ❑No 9 NA <br /> Was sensor ro erl replaced and <br /> p p y p El Yes ❑No RNA C l Yes ❑No X NA [--,Yes No X NA ❑Yes E No X NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ***Key***91 -T#5 (Tank#5 91 STP) D-T#6(Tank#6 Diesel STP) <br /> ***Tank#5 and Tank#6 failed hydrostatic test due to torn 3/4"electrical penetrations*** <br /> 2016 <br /> N_�AL HEALTH <br /> DEPARTMENT <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.