My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 10:45:06 AM
Creation date
6/23/2020 6:57:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 11 of 12 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑i UDC Manufacturer ?Industry Standard [-Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure C_ Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON-TS-STS Equipment Resolution: +/-0.002" <br /> UDC# 9-10 UDC# 11-12 UDC# 13 UDC# 14-15 <br /> UDC Manufacturer: Unknown Unknown Unknown Unknown <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top 13" 13" 12" 12" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 8" 8" 91. 91, <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested' 27" 25" 27" 26" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No C NA ❑Yes ❑No X,NA C7 Yes ❑No XI NA ❑Yes ❑No X NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?` L1,Yes ❑No ®NA E-1Yes ❑No ®NA I-]Yes L1No X NA ❑Yes ❑No X NA <br /> Was fail-safe verified to be <br /> ❑ <br /> operational? ❑ ']Yes CYes No DNA Yes No NA ❑Yes ❑No 9 NAYes [-,No NA <br /> Wait time between applying <br /> pressure/vacuum/water and 115 minutes 15 minutes 15 minutes 15 minutes <br /> starting test <br /> Test Start Time: 10:08am 09:49am 11:53am 11:53am <br /> Initial Reading(RI): 1.8137 2.7974 5.9975 6.1582 <br /> Test End Time: 10:24am 10:04am 12:08am 12:08pm <br /> Final Readin (RF): 1.8138 2.7987 5.9964 6.1583 <br /> Test Duration: 15 minutes 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-RI): +0.0001 +0.0013 -0.0011 +0.0001 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: ® Pass 0 Fail ® Pass; ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Was sensor removed for testing? ®Yes ❑No G NA X Yes ❑No NA G Yes ❑No ❑NA 9 Yes ❑No ❑NA <br /> Was sensor properly replaced and k Yes ❑No ❑NA X Yes ❑No ❑NA F Yes []No []NA FK- Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> �19V102016 <br /> L <br /> p4pTMENT <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to anV of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.