My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 9:05:40 AM
Creation date
6/23/2020 6:57:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018-2019
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2018-2019.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/8/2018 0 Work Order #9607524 <br />01/30 Arrived onsite and checked in at kiosk, checked in with manager. Checked supply voltage at turbines and all <br />above 108volts per leg and 199volts or better per 2 legs. On STP -SC III controllers for T2 and T3 voltage coming in <br />and going out is at 108volts per leg & 202volts per two legs. Amps staying consistent on all at around 10.9amps. <br />Also when amps are going up from supply demand Slave controller is coming on properly. Site is running smoothly <br />today. Checked pressures on line & monitored & not going below 20psi today. Site let me know upon checkout 2 <br />slow flows had just happened back to back on D25 after i just stopped monitoring it while completing work order. <br />Checked D25 & not much fuel pressure pushing by 2 stage valves on master & kiosk. May have intermittent handle <br />hook problem but site will need to monitor further as troubleshooting is showing no problems. After further <br />discussion with the site D25 had a slow -flow as the rest of the people fueling on D21 -D30 line we're not affected by <br />this site said slow flow. This would be a meter or pulsar locking up a dispenser on the POS & NOT the same as a <br />product line slow flow we are troubleshooting on T2 & T3. This issue does not have the capability of discriminating <br />between fueling points. It would only affect all of them or none of them. Checked out with manager at kiosk. <br />02/01 Arrived onsite and checked into Kiosk. Met with Mike Wenzl, Isaac Garcia and James Blaine. We monitored <br />line pressure on D21-30 for 4 hours while inspecting line equipment and dispensers for leaks or valve/interlock <br />issues. All checked out but T2 check valve was not holding well. Pulled T2 turbine and replaced old check valve <br />with new one. Also cleaned expansion relief valve. Tested after repairs. Check pressure holding at 30psi. Will return <br />in morning to follow up. <br />02/02 Arrived onsite and checked into kiosk. Checked the issues report log and found no issues since yesterday <br />morning. Monitored line pressures for a while all looks real good. We encountered an event just as we were <br />checking out. Site reported a percieved slowflow on 6 dispensers at the same time. We were monitoring pressure <br />just before and no pressure issues. They did have a drive off on #30 at the same time of the issue report and we <br />repaired a broken breakaway supplied by site and tested/inspected for any leaks or damage. OK. Monitored <br />pressure and operation after drive off repairs and no more issues. Line pressure has been consistent and no <br />thermal contraction so far. <br />Note: Left 2 remaining turbine check valves onsite(In Bio -Shed). <br />Call being completed on PO#1831262-6040902 <br />Description <br />https://admin.servicefusion.com/pdntJobWithoutRates?jobld=mDAy7--FOo5NJDGgjKeHmZJm_GWdxzi2pnDQ-CKOP_c 2/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.