My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 9:05:40 AM
Creation date
6/23/2020 6:57:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018-2019
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2018-2019.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inm"ahan Gida lrtstallation Racediwe <br /> The Red Jacket <br /> F X2V detector FIR E C E 1 V E <br /> installs in this:?port mAY 0 9 M8 <br /> 0 <br /> ENVIRONMENTAL <br /> !-I FAI Tea nX=DA QTUENT <br /> Tank vent poft <br /> (remove plug to <br /> install vent IuWng) ro <br /> Figure 1.FXV Installation poft In The Red Jacket <br /> 3. Examine straight bare below two-inch thread for corrosion roughness.If found to be rough,smooth with <br /> fine emery paper, <br /> 4. Apply UL-classilied non-toxic pipe thread sealant to the two-inch threads an the detector.Lubricate o-ring <br /> on the leak detector. <br /> 5. Screw the leak detector Into ft pump.Ughten with a wrench(top hex is 1.114 inch). <br /> 6. Installation of vent tube and snap tap connectors. <br /> For FXj V models <br /> a. Remove Winch pipe plug from tank test port in the Packer ton 6-inch Sig+lo applications,remove <br /> the 1/4-inch pipe plug from the riser/flange,assembly,for The Red Jacket pumps,see Figure 2). <br /> b. Apply a UL-classified nowtoxic pipe flvaBd sealant to the threads of&a Winch NPT straight vent <br /> tube fitting and instalf in tank test port of the packer.On 6-inch Big-Flo applications,the Winch NPT <br /> straight vent tube fitting may be installed into the risarl". 9 assembly. <br /> c. Apply a UL- sifted non-toxic.pipe thread sealant to the threads of ft Winch NPT 00-dagree vent <br /> tube fitting and install in rite leak detector vent opening in the cap of the leek detector. <br /> d. Install the vent tubing into both fittings and tighten per insim0iom on package. <br />
The URL can be used to link to this page
Your browser does not support the video tag.