My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (-) is "NO" or "NA", the entire UDC must be tested. (See SWR.CB LG -160) <br />SWRCB, January 2002 <br />page <br />of <br />i, ER-DISPENSER CONT 14WNT TES'T'ING <br />Test Method Developed By: <br />UDC Manufacturer <br />Industry Stan <br />Professional Engineer <br />Other (Spec) <br />Test Method Used: <br />Presence <br />Vacuum <br />Hydrostatic <br />Other (Specj&) <br />Teat Equlptnent Used: , .<, ..,. <br />Equipment Resolution: <br />UDC Z <br />UDC # UDC # <br />UDC # <br />UDC Manufacturer: <br />UPC Material: <br />UDC De <br />Height from UDC Bottom to Top <br />of ffighost P' is Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />res ' <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />No NA <br />Yes No NA Yes No <br />NA Yes <br />No NA <br />product and water)7° <br />'llubine shutdown re tithe <br />is system programmed for fail- <br />No NA <br />Yes No NA Yes Na <br />NA Yes <br />No NA <br />safe ahutdown7e <br />Was fail-safe verified to be <br />o erational?° <br />No NA <br />Yes No NA Yes No <br />NA Yes <br />No NA <br />Wait time between applying <br />pressure/vacuum/water and <br />LO I <br />stuting test <br />Test Start Time' <br />Initial Road' <br />'.t <br />Test End Time: <br />Fina! <br />Test Duration: <br />L T-6_% <br />in Rr3 <br />v <br />NasOPH Threshold or Criteria: <br />-;7— <br />zTest <br />TestResult: <br />❑ Pais air <br />C Pass ❑ Fail ❑ paw ❑ Fall C Paas <br />O Fail! <br />Was sensor removed for t~ <br />No NA <br />Yes No NA Yes No <br />NA Yes <br />No NA <br />Was sensor properly replaced and <br />No NA <br />Yes No NA Yes Na <br />NA Yes <br />No NA <br />verified Awational after test. <br />Comments —(include i ormatf on repairs made REjLor to tadh& and recommended ollow- <br />or ailed tests <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (-) is "NO" or "NA", the entire UDC must be tested. (See SWR.CB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.