My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the entire depth of the UDC is not tested, specify how inuch was tested. If the answer to My of the questions indicated whit an <br />asterisk(*) is "NO" or "NA the entire UDC must be tested. (See SWRCB LG -160) <br />SWRCB, January 2002 <br />i4 <br />Page <br />of <br />7, UNDER -(DISPENSE CONT! <br />G <br />Test Method Developed By: <br />i7bC Manufactureru <br />Stan <br />Professional Engineer <br />Other (SpeGO) <br />Test Method Used: <br />Pressure <br />Vacuum <br />Other) <br />T®St Egtupment <br />F.quipmeat R,osolutlon: <br />UDC # j <br />um # � <br />UDC 0 <br />UDC # � <br />UDC Mapttfaotutec: <br />UDC Material: <br />S <br />UDC the <br />2 <br />-e—AAM-3, 4 - <br />Height from UDC Bottom to Top <br />o£ Hi est Pi Penetration. <br />Height from UDC Bottom to <br />( <br />/ q <br />-� <br />t �°-( <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />/� cam, <br />ids•-- <br />�j vo►� <br />"` ® <br />G o c. vi <br />Portion of UDC Teshed <br />fi"'y <br />` !' " <br />t <br />y <br />Doo$ turbine shut down when <br />UDC seams detects liquid (both <br />No NA <br />No NA <br />No NA <br />No <br />NA <br />product and water)?� <br />Ttirbisu shutdown w time <br />17 <br />�'" • <br />Is system pro e d for fail- <br />"C® shutdown? <br />No NA <br />No NA <br />No NA <br />Ado <br />NA <br />Was fatlsafe vended to be <br />raion—w <br />No NA <br />No ATA <br />gJ52 No NA <br />No <br />NA <br />Wait time between applying <br />pvmuro/vacutmn/w�tor and <br />St$a1jAg teat <br />Test Time:T.y7.� <br />.��Start <br />h" heft : <br />�..�G/ G <br />ems► <br />y <br />Test End Time: <br />• B <br />: Q <br />I v <br />Final <br />'9P <br />, <� <br />St 1 <br />'? <br />Test Duration: <br />►..,.L, <br />® in R[): <br />Passffl il Threshold or Criteria: <br />.66"Z <br />• Ou 2- <br />. nu <br />•^� c+' �- <br />Teat Result~ <br />ss ❑ Fog <br />❑Paas %9 Fail <br />Pan O Fail <br />Was sensor removed for WstiW <br />No NA <br />No NA <br />No <br />NA <br />Was sensor properly replaced and <br />No NANo <br />ATA <br />No NA <br />No <br />NA <br />verified ftwdonal after tostim? <br />If the entire depth of the UDC is not tested, specify how inuch was tested. If the answer to My of the questions indicated whit an <br />asterisk(*) is "NO" or "NA the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.