Laserfiche WebLink
SWRCB,January 2002 <br /> Page of <br /> 6. PIPING SUA11PSTING <br /> Test Method Developed ❑Sump Manufacturer ❑Industry Standard )OProfessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: I 13CO 0- ' Equipment Resolution: a.0001 <br /> Su #/ <br /> Sump Sump# Sump <br /> Sump Diameter: 5 �Z '57, <br /> Sump Depth: 7 ®` 7 ►. 17%61 <br /> SumpMaterial: <br /> Height from Tank Top to Top of " a ►, <br /> H:iyLest Piping Penetration: <br /> Height from Tank Top to Lowest 6 ,, El2N h <br /> Electrical Penetration: <br /> Condition of sump prior to testing: G <br /> Portion of Sump Tested' %I ®, W1 <br /> Does turbine shut down when yes ❑No ❑NA <br /> sump sensor detects liquid(both Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> roduct and water?® <br /> Turbine shutdown response time a 8 G C. S S <br /> Is system programmed for fait-safe Yes ❑No ❑NA <br /> shutdown?` ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be es ❑No ❑NA <br /> OP erational?' Aes ❑No ❑ es ❑No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting / , <br /> test: <br /> Test Start Time: ID:01 AM 1;30 fam 11:60 <br /> Initial Reading(RI): 'F 'I I- 7f'67►, ✓�-'® t '' <br /> Test End Time: ® : 14 Am 1 ® ® s- <br /> Final Reading(RF): 6.54 ,3 °` I =76,6 7►` <br /> Test Duration: 1C M/ /,C-m 1/0, 14;m t <br /> Change In Reading(Rg-RI): op " 0-00C>011 ,v ,1 <br /> Pass/Fail Threshold or Criteria: <br /> TestReslt: Pass ❑Fail Pass ❑Fail Pass ®❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? es ❑No 0 NA Yes ❑No ❑NA AYes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and XYes ❑No 0 NA ❑No 11 NA Yes ❑No El NA ❑Yes El No El NA <br /> verified functional after testin ? OeS <br /> Com ants—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> `If the entire depth of the sump is not tested,specify how much was tested. If the answer to py of the questions indicated with an <br /> asterisk(*)is" O"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />