My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 2:56:37 PM
Creation date
6/23/2020 6:57:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> fi -DISPENSER CONTAINMENT TESTING <br /> Test Method Developed y: ❑UDC Manufacturer ❑Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure D Vacuum ydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: t S STS Equipment Resolution: 1" <br /> 1UDC C# UDC# <br /> UDC Manufacturer: Vj 6r. <br /> UDCMaterial: <br /> UDC D th: ` ►® `c , <br /> Height from UDC Bottom to Top ,: <br /> of Hi est PjpLng Pip' Penetration: <br /> Height from UDC Bottom to su t► „ ,► <br /> Lowest Electrical Penetration: 1 1 1 1 <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested 14% 1 " , n ®, <br /> Does turbine shut down when Yes D No DNA <br /> UDC sensor detects liquid(both Yes ❑No D NA AYes ❑No D NA XYes D No [INA <br /> roduct and water?g <br /> Turbine shutdown reonce time 6 fp6t. 49 66c, ,5 s6 S67 <br /> Is system programmed for fail- Yes ❑Na ❑NA <br /> safe shutdown?* Yes DNo DNA KYes ❑No ❑ ❑NA Yes No D NA <br /> Was fail-safe verified to be ^Yes ❑No ❑NA <br /> operational?* Yes D No ❑ Yes ❑No ❑NA KYes ❑No D NA <br /> Wait time between applying <br /> pressure/vacuum/water and vaL % 1 t2� 1 f <br /> starting test <br /> Test S Time: :p-Z ` :O"T p* <br /> Initial eadm .• ' <br /> Test End Time: P ;35 <br /> Final Reading i . 61 S`® •j 0. ®® <br /> Test Duration: 16"IP 1 1;3— 1-6 M 11Q IQ' <br /> Change in Reading(RF-R$): Q, 11 ®®r ` . .® e® <br /> Pass/Fail Threshold or Criteria: — " _ o '® _ ®. " <br /> Test Result: ❑ Pass ❑Fail ❑ Pass D Fail D Pass ❑.Fail Pass 0 Fail <br /> Was sensor removed for testing? Ayes D No D NA XYes D No ❑NA Yes D No DNA Yes ❑ o DNA <br /> Was sensor properly replaced and JCYes D No ❑NA Yes No ❑NA Yes El No ❑NA Yes D No ❑NA <br /> verified functional after testing? <br /> ------------ <br /> Cm ets—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to apy of the questions indicated with an <br /> asterisk(*)is"NO"or"NX',the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.